Technical data
CONNECTIONS – PLUMBING 
31 
PIPE SIZES 
To  achieve  true  mains  pressure  operation,  the  cold  water  line  to  the  water 
heater should be the same size or bigger than the hot water line from the water 
heater. 
The pipe sizing for hot water supply systems should be carried out by persons 
competent to  do  so, choosing  the  most suitable  pipe size  for each individual 
application. Reference to  the technical specifications  of the  water heater  and 
local regulatory authority requirements must be made. 
TEMPERATURE PRESSURE RELIEF VALVE 
The temperature  pressure relief valve is shipped behind the  front cover.  The 
temperature  pressure  relief valve  must be  fitted before  the water  heater  is 
operated. Before fitting the relief valve, make sure the probe has not been bent. 
Seal the thread with Teflon tape - never hemp. Make sure the tape does not 
hang over the end of the thread. 
Screw the valve  into the correct opening  (refer to the  installation diagram on 
page 28) leaving the valve drain pointing downwards. Do not use a wrench on 
the valve body  - use the spanner flats provided. A copper drain line must be 
fitted to the temperature pressure relief valve (refer to "Relief Valve Drain" on 
page 32). 
The valve must be insulated with closed cell polymer insulation or similar 
(minimum thickness 9 mm) and the insulation installed so as not to impede the 
operation of the valve. The insulation must be weatherproof and UV resistant if 
exposed. 
EXPANSION CONTROL VALVE 
Local regulations may make it mandatory to install an expansion control valve 
(ECV)  in  the  cold  water  line  to  the  water  heater.  In  other  areas,  an  ECV  is 
required if the saturation index is greater than +0.4 (refer to “Water Supplies” 
on page 14). 
The expansion control valve must always be installed after the non return valve 
and be  the  last  valve installed prior  to  the water heater  (refer  to  diagram  on 
page 30).  A  copper  drain  line  must  be  fitted  to  the  expansion  control  valve 
(refer to "Relief Valve Drain" on page 32). 
The valve must be insulated with closed cell polymer insulation or similar 
(minimum thickness 9 mm) and the insulation installed so as not to impede the 
operation of the valve. The insulation must be weatherproof and UV resistant if 
exposed. 