REVLC08S40A-SPAX2 PowerLab 8 V2 Battery Workstation Manual

48
Node Wiring =: When set to FMA Wiring, PowerLab looks for FMA/Cellpro wiring
convention on the balance port. When set to XH/EH Wiring, PowerLab looks for the
JST XH/EH wiring convention on the balance port. See FMA Wiring mode vs. XH/EH
Wiring mode later in this user guide for more details.
Enable Quick Start: When checked, you can skip over a preset’s questions
regarding available modes of operationjust press and hold ENTERwhen
preparing to charge a pack at the PowerLab 8.
Suppress Use Bananas Question: When checked, the charge sequence does not
ask whether you are charging using the banana cable.
Choose Power Source at Startup: When checked, you must always specify the
power source immediately after applying power to PowerLab 8.
Save and load options
To save a set of options on your computer: Click the Save to File... button. Select a
Folder, enter a name, then click the Save button.
To load a set of options from your computer:
1. Click the Load from File... button.
2. Locate and select the options file, then click the Open button.
3. Click the Update button to download the options to PowerLab 8.
Note: If this option is checked, PowerLab 8 assumes you are charging using
the banana cable. Attempting to charge using only balance wires will result in
a Safety Code.
Tip: If you always use the same power source, specify the power source in
the Supply tab, then uncheck the Choose Power Source at Startup option.
This will save you a step each time you power up the PowerLab 8.