Instructions / Assembly
12400 Earl Jones Way
Louisville, KY 40299
rev-a-shelf.com
Customer Service: 800-626-1126
SINK BASE PULLOUT - NOT DOOR MOUNTING
TOOLS REQUIRED:
ESTIMATED ASSEMBLY
TIME:
20 MIN
CARE AND MAINTENANCE:
CLEAN WITH A DAMP CLOTH
AND WIPE PARTS DRY
Fig. A
Fig. B
Screw Locations
Center line
T-5SBWC-0517
5
64
Screw Locations
1) Measure how far the hinge sticks out into the cabinet opening and record that
number (A).
2) Take the number from step one (A) and add 4-3/4” (121 mm).
(A) + 4-3/4 (121 mm) = (B)
3) Place template into cabinet and align the front edge per cabinet type:
a. Overlay - Place at the front outside edge of cabinet
b. Inset door - Set back the thickness of the cabinet door
From the hinge side of the cabinet use measurement (B) to align center line.
4) Use an awl or pencil to mark the (4) screw locations and remove the template.
5) Pre-drill (4) 5/64” holes at screw locations.
6) Attach handle to frame (See Fig A).
7) Place frame in cabinet, lining up the holes and install screws.
8) Snap in (4) plastic caps to cover holes (See Fig B).