2400 Earl Jones Way Louisville, KY 40299 rev-a-shelf.com 800-626-1126 5PSP SOFT-CLOSE CHROME BLIND CORNER ORGANIZER TOOLS REQUIRED: 1 1 8 4 5PSP-15 Item No. 11 11 4 4 #2 CHECK LIST 88 #2 PANELS Item No.
Full Height Blind Right Full Height Blind Right A Blind Portion Blind Portion of Cabinet of Cabinet 8 19 5 Door Opening Full Height Blind Left Shown with adjacent cabinet 2 3 B Door Opening (Left) Full Height Blind Left Shown with adjacent cabinet E Blind Portion of Cabinet 5PSP-15 (LEFT HANDED DOOR/15” OPENING) Door Opening Door Opening Door Opening Door Opening Door Opening D Mount Base (Fig A) 2.
12” (305mm) 2. 5 1 2. 2. STEP 4 Adjust front wheel position for left hand opening. (Fig E) 2 Attach feet (C) using A screw (3) (Fig F) 3 Fig 14” (357mm) E 2 D 1 F) D 4 3 3 5 C BLIND 4. 1 BDOOR 3. (Left) 2 STEP 5 A Fig G) 1. 4. 7-1/4 ” (184mm) 4 4 4. 5 5. 12” (305mm) D 4 2 5. 4 1 A 4. 1. (Left) 5. STEP 6 Fig H) Hang the baskets as shown. (Fig H) NOTE: Baskets show in forward position. They can be moved to the rearward position for additional clearance.
M5x6mm flat-headed screw 5 5/32 x18mm wood screw Door Opening Door Opening Full Height Blind Left Blind Portion Blind Portion of Cabinet of Cabinet Foot 1 Guide channelDoor Opening 1 Basket 4 (Right) C 1 2 B 5PSP-15 (RIGHT HANDED DOOR/15” OPENING) A Door Opening E Door Opening FITTINGS CHECK LIST 3 STEP 1 Description QTY 1 2 3 4 5 (Right) Fig A) 2 Handle Mount Base (Fig A) 4 M4x10mm flat-headed screw 2 M6x10mm wafer head screw 8 Note: If installing into a face M5x6mm flat-headed screw 8
.3 STEP 4 Adjust front wheel position for right hand opening. (Fig E) 2 Attach feet (C) using A screw (3) (Fig F) K LIST 5 3 QTY 2 4 crew 2 crew 8 rew 8 5 rew 19 2 3 Fig F) D 3 4. BLIND 3. 1 4. (Left) C 1. 5. B 5 D A E 10” (256mm) STEP 5 5. DOOR Fig G) 2 3 Secure the feet (C) 3 7-1/4 ” (184mm) to3the base (A) using screw (4) K LIST QTY (Fig G) 2 .5 4 crew 2 crew 8 rew 8 5 rew 19 2 D4 .4 A 12” (305mm) .4 4 1 4 5. 1. Fig H) (Left) STEP 6 3. Hang the baskets as shown.
1 Door Opening Door Opening A Full Height Blind Right 4 Full Height Blind Right Full Height Blind Left Shown with adjacent cabinet 5 Blind Portion Blind Portion of Cabinet of Cabinet 5 Full Height Blind Left (Left) Shown with adjacent cabinet 5PSP-18 (LEFT HANDED DOOR/18” OPENING) D Door Opening Door Opening STEP 1 Door Opening 1. Fig A) (Left) Mount Base (Fig A) 1. (Left) Note: If installing into a face frame cabinet, Slide Base A must be flush with the face frame opening. 2.
12” (305mm) 2. 2. 5 2. 2. STEP 4 Adjust front wheel position for left hand opening. (Fig E) 2 Attach feet (C) using A screw (3) (Fig F) Fig F) 3 3. 3 E 2 D 1 3 D 4 3 3 5 BLIND 4. 3. 1 DOOR (Left) 4. C 5. 1. 5. B Fig G) STEP 5 A Secure the feet (C) K LIST 3 to the base (A) using screw (4) QTY (Fig G) 4. 2 4 crew 2 crew 8 rew 8 5 rew 19 4 Hang the baskets as shown. (Fig H) NOTE: Baskets show in forward position.
Door Opening Full Height Blind Left B 5PSP-18 (RIGHT HANDED DOOR/18” OPENING) A Door Opening 1 2 3 4 5 (Right) 2 Handle Mount Base (Fig A) 4 M4x10mm flat-headed screw 2 M6x10mm wafer head screw 8 Note: If installing into a face M5x6mm flat-headed screw 8 5 frame cabinet, Slide Base A 5/32 x18mm wood screw 19 2. BLIND 7-1/4” (184mm) 10” (256mm) (Right) Faceframe 2 QTY 14” (357mm) 20141120-B01 B C Fig B) 3. 3 Base Attach Handles.
5 Fig E) 1 .3 STEP 4 Adjust front wheel position for right hand opening. (Fig E) 2 Attach feet (C) using A screw (3) (Fig F) 3 2 3 E 1 D 3 4 Fig F) D 3 3 5 4. BLIND 3. 5. DOOR (Left) 4. 1 1. C Fig G) B 5. 5 D E 10” (256mm) A STEP 5 3 Secure the feet (C) K LIST 3 to the base (A) using screw (4) QTY (Fig G) .5 2 4 crew 2 crew 8 rew 8 5 rew 19 A 7-1/4 ” (184mm) 2 4 2 .4 D .4 12” (305mm) 4 1 4 5. Fig H) 1. (Left) STEP 6 Hang the baskets as shown. (Fig H) 3.
12400 Earl Jones Way, Louisville, KY 40299 (800) 626-1126 www.rev-a-shelf.com 10 800-626-1126 | rev-a-shelf.
12400 Earl Jones Way Louisville, KY 40299 rev-a-shelf.
5 K LIST QTY 2 crew 2 crew 8 crew 8 crew 19 Door Opening Full Height Blind Right 2 B Door Opening Full Height Blind Right APersiana Blind Portion of Cabinet (Left) Full Height Blind Left Blind Portion of Cabinet Door Opening 5 Shown with adjacent cabinet 5PSP-15 (APERTURA DE PUERTA PARA MANO IZQUIERDA/15”) 5PSP-15 (PORTE VERS LE CÔTÉ GAUCHE/OUVERTURE DE 15”) Door Opening Puerta/ Porte 8 19 Door Opening Full Height Blind Left Shown with adjacent cabinet Coin mort 3 4 M5x6mm flat-headed
12” (305mm) 2. 2. 3. Fig E) 1. (Left) 2. 4 Sujete el pie (C) usando el K LIST tornillo (3) (Fig F) QTY 1 Réglez la position de la roue 1 avant pour une ouverture vers 1 la gauche. (Fig E) 2 Fixez les pieds (C) en A utilisant la vis (3) (Fig F) QTY 13 K LIST QTY 1 21 4 crew 21 5 2 lcrew 81 Asegure el pie (C) a laAbase (A) tornillo (4) (Fig G) rew 84 usando 5 Krew LIST19 3 B 3 E 3 4. C Persiana Coin mort B 3. D 1 Puerta/ Porte 4. Fig G) D 5. 1.
4 M5x6mm flat-headed screw 5 5/32 x18mm wood screw Door Opening Door Opening Full Height Blind Left C D E Foot 1 Puerta/ Porte Guide channel 1 Basket 4 (Right) C 1 2 B 5PSP-15 (APERTURA DE PUERTA PARA MANO DERECHA/15”) 5PSP-15 (PORTE VERS LE CÔTÉ DROIT/OUVERTURE DE 15”) A Door Opening E Door Opening FITTINGS CHECK LIST 3 1 Description QTY 1 2 3 4 5 5 (Right) Fig A) 2 Handle Base de montaje (Fig A) 4 M4x10mm flat-headed screw 2 M6x10mm wafer head screw 8 Nota: Si está instalando dentro M5
5 3. Fig E) 1. (Right) B .3 Ajuste la posición frontal del volante para apertura de mano izquierda (Fig E) Sujete el pie (C) usando el 2. 2 K LIST tornillo (3) (Fig F) QTY5 1 3 1 12” (305mm) B Réglez la position de la roue avant pourDl’ouverture vers la droite (Fig E) 2 Fixez les pieds (C) en A utilisant la vis (3) (Fig F) C Fig F) 3 3 Fixez K LIST 3 les pieds (C) à la base (A) QTY à l’aide de la vis (4) (Fig G) 3 2 4 crew 2 crew 8 .5 rew 8 5 6 rew 19 C Persiana 4. mort Coin 3.
1 QTY 192 2 8 8 19 2 4 Door Opening Door Opening A Full Height Blind Right 3 Full Height Blind Right 2 3 4 5 D M4x10mm flat-headed screw 2 M6x10mm wafer head screw 8 M5x6mm flat-headed screw 8 5/32 x18mm wood screw 19 4 5 Full Height Blind Left (Left) Shown with adjacent cabinet 5PSP-18 (APERTURA DE PUERTA PARA MANO IZQUIERDA/18”) D 5PSP-18 (PORTE VERS LE CÔTÉ GAUCHE/OUVERTURE DE 18”) Blind Portion of Cabinet Blind Portion Persiana of Cabinet Coin mort Door Opening Door Opening Puerta/ P
2. 3. 2. Fig E) (Left) 1. 2. 4 Ajuste la posición frontal del volante para apertura de mano izquierda (Fig E) Fig F) 2 5 1 2 Fixez les pieds (C) en utilisant A l 1 la vis (3) (Fig F) K LIST4 QTY 13 K LIST Persiana 5. Coin mort Puerta/ Porte D 4. 5. E Fig G) D 5 D 1. (Left) 4 4 A 7-1/4 ” (184mm) (Left)4. 5. 5. 4 10” (256mm) Cuelgue las canastas como se muestra.
Door Opening Full Height Blind Left Persiana Blind Portion Coin mort of Cabinet D E 1 1 Puerta/ Porte Guide channel 1 Basket 4 4 M5x6mm flat-headed screw 5 5/32 x18mm wood screw Door Opening 5 Full Height Blind Left Shown with adjacent cabinet 2 (Right) C 1 B 5PSP-18 (APERTURA DE PUERTA PARA MANO DERECHA/18”) 5PSP-18 (PORTE VERS LE CÔTÉ DROIT/OUVERTURE DE 18”) A Door Opening (Right) 2 Handle Base de montaje (Fig A) 4 M4x10mm flat-headed screw 2 M6x10mm wafer head screw 8 Nota: Si está insta
5 3. Fig E) B .3 4 2. Sujete el pie (C) usando el 2 12” (305mm) Réglez la position de la roue avant pourDl’ouverture vers la droite (Fig E) 2 Fixez les pieds (C) en A utilisant la vis (3) (Fig F) A Asegure el pie (C) a la base (A) 5 usando tornillo (4) (Fig G) 3 les pieds (C) à la base (A) Fixez à l’aide de la vis (4) (Fig G) 3 C Fig F) 3 E 3 B Puerta/ Porte 5. D 4. 5. Fig G) E 5 D D (Left) 1. 4 .5 .4 Cuelgue las canastas como se muestra. (Fig H) 4 (Left) 5.
12400 Earl Jones Way, Louisville, KY 40299 (800) 626-1126 www.rev-a-shelf.com 20 800-626-1126 | rev-a-shelf.