Instructions / Assembly

3
⁄”
[20mm]
⁄”
[20mm]
2
⁄”
(54mm)
6
⁄”
(160mm)
2
⁄”
(54mm)
6
⁄”
(160mm)
9 ⁄”
(246mm)
Center line of cabinet
For 24” unit For 36” unit
15 ⁄”
(396mm)
9 ⁄”
(246mm)
For 24” unit For 36” unit
15 ⁄”
(396mm)
INSTALLATION INSTRUCTIONS: 5PD SERIES PULL DOWN
Attach the two wire baskets to
the side frames using qty (8)
M5x8 pan head machine screws
as shown in gure 3. Note:
Screws may already be attached
to brackets.
Attach the handle to the side
frames using qty (2) M5x8 pan
head machine screws as shown
in gure 4. Note: Screws may
already be attached to handle.
Mount this assembly to the
bottom mount brackets. The
rear of the side frames will slide
over a pin on the bottom mount
brackets. Qty 4 M4x6 pan head
screws are used in the front only
as shown in Fig. 5.
NOTE
Screws will have to be removed
from wire basket ends rst.
Same screws are then used to
attach.
STEP 3
Attach the two cover plates to
the side frames to cover the
screws installed in Fig. 5.
STEP 4
Assembly
FIG.
3
FIG.
5
FIG.
4
#4 M5x12 Machine screws
#6 M4x6 machine head screws
Remove the screws which are already fastened to
Part E (handle)
D
C
F
4
#2
#2