Installation Instructions

800-626-1126 | rev-a-shelf.com
2
B
K
A
2
1
1
3
* Installation either
left or right side
would be ne.
*Install Bearing
in Lower Bearing
Bracket.
20 -5/64” (510mm)
33-55/64” - 34-1/4”
(860-870mm)
B
C
A
12
C
F
B
5
*lastly, lock Upper
Cover with Screw tightly.
*If the height of Inner
Extension Frame is too
low to t in, cut the
length of plastic plug
by yourself.
50” - 66-37/64”
(1270-1615mm)
M5 Screw
M4 Cover Screws
2
3
1
D
4
11
2
Before
After
According to the above
dimension, install Upper Runner,
LowerRunner, catch and
Bearing Bracket and lock tightly.
1
Put Inner Frame into cabinet
and lock Upper Cover to Upper
Runner.
2
B
*When putting Upper Runner, pull out black catch then
push the runner into. Finally, push the black catch back.