Installation Guide
I-5707-0115-TRI
INSTALLATION
INSTRUCTIONS
5707 Blind Corner Organizer with Soft Close
(800) 626-1126
www.rev-a-shelf.com
FITTING PARTS LIST:
PANEL PARTS LIST:
Item No. 5707-15/5707-18
A
B
C
D
E
F
G
8
7
5
6
4
3
1
2
H
I
J
1
1
1
1
1
2
1
2
2
30
1
1
2
2
1
1/4
H
D
C
7
6
9
J
4
1
1
A
8
9
10
20140212-01
1
G
E
5
4
2
F
2
I
B
3
3
990-1219mm
A
2/4
10
2
K
1
K
K
H
F
33.5
487.5
512
192
192
478.5
16
462.5
478.5
16
16
16
148
828
260(5707-15)
340(5707-18)
490-690
24
B
4
K
A
Bottom & Flank dimension
Door dimension
1. According to the Flank dimension,
screw and on the flank-board.
Tighten the pre-installed screw .
Unit: mm
*After adjusting, lock 4
sides screw tightly.
One Action Corner Kit(Soft closing function)
QTY
Description
Description
PANELS CHECK LIST
FITTINGS CHECK LIST
Inside Frame
Swivel Frame
Up Bracket
Support
Bottom holder
Screw
Screw
Connecter
Large Basket
Small Basket
Plastic cover
Screw
Screw
Gas Spring
Bracket
QTY
Outside frame
Open angle dimension
Unit: mm
Bracket
Screw
Down Bracket
Stopper
Adjustable Bracket
K
2. Screw the with the , make sure to
align side edges.
B
B
B
H
3.Screw on . Align the
with by holes then screw it.
F
Item No. 5707-15/5707-18
A
B
C
D
E
F
G
8
7
5
6
4
3
1
2
H
I
J
1
1
1
1
1
2
1
2
2
30
1
1
2
2
1
1/4
H
D
C
7
6
9
J
4
1
1
A
8
9
10
20140212-01
1
G
E
5
4
2
F
2
I
B
3
3
990-1219mm
A
2/4
10
2
K
1
K
K
H
F
33.5
487.5
512
192
192
478.5
16
462.5
478.5
16
16
16
148
828
260(5707-15)
340(5707-18)
490-690
24
B
4
K
A
Bottom & Flank dimension
Door dimension
1. According to the Flank dimension,
screw and on the flank-board.
Tighten the pre-installed screw .
Unit: mm
*After adjusting, lock 4
sides screw tightly.
One Action Corner Kit(Soft closing function)
QTY
Description
Description
PANELS CHECK LIST
FITTINGS CHECK LIST
Inside Frame
Swivel Frame
Up Bracket
Support
Bottom holder
Screw
Screw
Connecter
Large Basket
Small Basket
Plastic cover
Screw
Screw
Gas Spring
Bracket
QTY
Outside frame
Open angle dimension
Unit: mm
Bracket
Screw
Down Bracket
Stopper
Adjustable Bracket
K
2. Screw the with the , make sure to
align side edges.
B
B
B
H
3.Screw on . Align the
with by holes then screw it.
F
TOOLS REQUIRED:
ESTIMATED ASSEMBLY
TIME:
45 MIN
CARE AND MAINTENANCE:
CLEAN WITH A DAMP CLOTH
AND WIPE PARTS DRY.
Description QTY
1
Plastic Cover
1
2
M6x12mm button head
screw
2
3
M5x6.5mm bolt
2
4
M5x8mm machine screw
2
5
5/32x18mm wood screw
22
6
Gas Spring
1
7
M4x6 at-headed screw
4
8
Top Bracket
1
9
Bottom Bracket
1
10
Door Stopper
1
11
M5x8 hex ange cross bolt
3
Description QTY
A
Inside Frame
1
B
Swivel Frame
1
C
Door Frame
1
D
Up Bracket
2
E
Down Bracket
2
F
Bottom holder
1
G
Connecter
1
H
Support Arm
1
I
Inside Frame (A)
Baskets
2
J
Door Frame (C) Baskets
2
K
Adjustable Side Bracket
1
WOVEN BASKET INSTALLATION INSTRUCTIONS
ESTIMATED ASSEMBLY TIME:
20 MIN
CARE AND MAINTENANCE:
Clean basket and wood frame with a damp cloth and wipe parts
dry. Machine wash liner in cold water with like colors.
2409 Plantside Dr., Jeersontown, KY 40299
800.626.1126
www.rev-a-shelf.com
1) Measure the inside cabinet width (ICW) at desired height for wood rails.
2) Measure the width of basket wood frame (BW).
3) Subtract BW from ICW. Divide answer by 2. Subtract 1/16” from answer.
This will give you the dimension needed from bottom of groove to back of wood
rail (ICW-BW) ÷ 2 - 1/16”.
4) Cut wood rails per steps 1-3.
5) Place rst cut rail in cabinet with front of rail against back of face frame (for
frameless cabinets, ush with front of cabinet.) at desired height. Secure the front
hole with proper size screw. (Screws not included due to variant in cabinet wall
thicknesses) (Make sure screw does not go through outside wall of cabinet).
Part list:
NOTE: SCREWS NOT INCLUDED DUE TO VARIANT SIZES IN CABINETS
(ICW-BW) ÷ 2 - 1/16”
Desired Height
of Rail
Inside
Cabinet
Width
(ICW)
Basket
Width
(BW)
Bottom of groove
Back of wood rail
8) Install second rail on opposite side of cabinet per steps 5-6 at height
location from step 7.
7) Measure from oor of cabinet to bottom of installed rail.
6) Make sure rail is level, then secure to cabinet with screws at
remaining hole locations.
9) Slide in basket.
I-4WV-TRI-1013
Bottom of
rail to oor of
cabinet
Repeat steps for additional baskets.
Visit our YouTube Channel for an installation video of this product
Youtube.com/REVASHELF
1/16”