2400 Earl Jones Way Louisville, KY 40299 rev-a-shelf.com 800-626-1126 5PSP SOFT-CLOSE CHROME BLIND CORNER ORGANIZER TOOLS REQUIRED: 1 8 1 4 Item No. 5PSP-15 PANELS CHECK LIST 3 1 3 #2 8 C Foot7 1 1 1 1 31 84 33 88 2 2 M4x10mm flat-headed screw 2 3 M6x10mm wafer head screw 8 1 MAINTENANCE: 2 CARE AND 4 M5x6mm flat-headed screw 8 3 8 Clean with a damp cloth and 5 5/32 x18mm wood screw 19 11 22 wipe parts dry.
Full Height Blind Right A Blind Portion Blind Portion of Cabinet of Cabinet 8 19 5 Door Opening Full Height Blind Left Shown with adjacent cabinet 2 3 B Full Height Blind Right Door Opening (Left) Full Height Blind Left Shown with adjacent cabinet E Blind Portion of Cabinet 5PSP-15 (LEFT HANDED DOOR/15” OPENING) Door Opening Door Opening Door Opening Door Opening Door Opening D Mount Base (Fig A) 2.
12” (305mm) Item No. 5PSP-18 PANELS CHECK LIST Description QTY 2 C A 2. B 3 Adjust front wheel position for 2 1 Handle left 2hand opening. M4x10mm flat-headed screw(Fig 2 E) 4 2 3 M6x10mm wafer head screw 8 4 M5x6mm screw A 8 Attach feetflat-headed (C) using 5 5/32 x18mm wood screw 19 screw (3) (Fig F) D 3 E 5 D 3 Fig F) 1. (Left) 3 D 4 3 3 5 4. 1 (Left) 2 STEP 5 A C BLIND 1. 4. 3. D 5 4 2 5. 4 1 4 1. A Fig H1) Fig H2) Attach Hooks (Orion Gray): 5. 3.
M5x6mm flat-headed screw 5 5/32 x18mm wood screw Door Opening Door Opening Full Height Blind Left Blind Portion Blind Portion of Cabinet of Cabinet Foot 1 Guide channelDoor Opening 1 Basket 4 (Right) C 1 2 B 5PSP-15 (RIGHT HANDED DOOR/15” OPENING) A Door Opening E Door Opening FITTINGS CHECK LIST 3 STEP 1 Description QTY 1 2 3 4 5 5 Full Height Blind Left Shown with adjacent cabinet (Right) Fig A) 2 Handle Mount Base (Fig A) 4 M4x10mm flat-headed screw 2 M6x10mm wafer head screw 8 Not
20B-02114102 2. .2 C Fig E) 5 STEP 4 3 .1 D Fig F) D 3 3 2 4. BLIND 1 4. STEP 5 C 1. 5. A E. 3 10” (256mm) 2 )mm753( ”41 B Fig G) 5. 1 DOOR (Left) E ”4/1-7 )mm652( ”01 )mm481( l 3 B 4 1 1 1 1 4 .2 3. D 5 K LIST QTY B B Adjust front wheel position for right hand opening. (Fig E) 2 Attach feet (C) using A screw (3) (Fig F) K LIST 5 3 QTY 2 4 crew 2 crew 8 rew 8 5 rew 19 C E 2.
1 Door Opening Door Opening A Full Height Blind Right 4 Full Height Blind Right Full Height Blind Left Shown with adjacent cabinet 5 Blind Portion Blind Portion of Cabinet of Cabinet 5 Full Height Blind Left (Left) Shown with adjacent cabinet Blind Portion of Cabinet Door Opening STEP 1 Mount Base (Fig A) Door Opening Door Opening 1. Fig A) (Left) 1. (Left) Note: If installing into a face frame cabinet, Slide Base A must be flush with the face frame opening. 2.
12” (305mm) PANELS CHECK LIST Description QTY K LIST QTY 1 1 1 1 4 K LIST QTY 2 crew 2 crew 8 rew 8 rew 19 A B C D 1E Base Frame Foot Guide channel Basket STEP 4 1 1 1 1 4 FITTINGS CHECK LIST Description QTY 2. 1 2. 2 B A 2. 3. B 3 Adjust front wheel position for 2 1 Handle left 2hand opening. (Fig E) 4 M4x10mm flat-headed screw 2 2 3 M6x10mm wafer head screw 8 Attach feetflat-headed (C) using 4 M5x6mm screw A 8 5 5 5/32 screw (3)x18mm (Figwood F) screw 19 D 3 E D Fig F) 3 1.
Door Opening Full Height Blind Left B 5PSP-18 (RIGHT HANDED DOOR/18” OPENING) A Door Opening 1 2 3 4 5 (Right) 2 Handle Mount Base (Fig A) 4 M4x10mm flat-headed screw 2 M6x10mm wafer head screw 8 Note: If installing into a face M5x6mm flat-headed screw 8 5 frame cabinet, Slide Base A 5/32 x18mm wood screw 19 2. BLIND Faceframe No. 5PSP-15 m 1. 3 B 2 QTY 4. 2 To front of cabinet 14” (357mm) 12” (305mm) 1 From Door Opening C 1 1 Base CK LIST 1 Frame n QTY 1 Foot 1 2 2.
20B-02114102 2. C 15 STEP 4 E 2. 2 Attach feet (C) using A screw (3) (Fig F) 3 3 3 B 4 D ”4/1-7 )mm652( ”01 )mm481( 3 3 2 5 4. BLIND (Left) 4. )mm753( ”41 STEP 5 5. B .3 E 10” (256mm) 2 1. C Fig G) 5. 1 DOOR 1 E Fig F) .1 D A Secure the feet (C) 7-1/4 ” (184mm) K LIST 3 to the base (A) using screw (4) QTY (Fig G) .5 2 4 crew 2 crew 8 rew 8 5 rew 19 2 .
12400 Earl Jones Way, Louisville, KY 40299 (800) 626-1126 www.rev-a-shelf.com 10 800-626-1126 | rev-a-shelf.
12400 Earl Jones Way Louisville, KY 40299 rev-a-shelf.com 800-626-1126 INSTRUCCIONES DE INSTALACIÓN / LES INSTRUCTIONS D’INSTALLATION SISTEMA DE CIERRE SUAVE CROMADO PARA ORGANIZADOR DE ESQUINA CIEGO 5PSP SYSTÈME 5PSP DE RANGEMENT POUR COIN MORT EN CHROME AVEC FERMETURE EN DOUCEUR Lista de partes: Liste des pièces: Item No. 5PSP-15 1 1 PANELS CHECK LIST 8 QTY Item No.
5 K LIST QTY 2 crew 2 crew 8 crew 8 crew 19 Door Opening Full Height Blind Right 2 B Full Height Blind Right APersiana Door Opening (Left) Full Height Blind Left 5PSP-15 (APERTURA DE PUERTA PARA MANO IZQUIERDA/15”) 5PSP-15 (PORTE VERS LE CÔTÉ GAUCHE/OUVERTURE DE 15”) Door Opening Puerta/ Porte Door Opening 5 Shown with adjacent cabinet Blind Portion of Cabinet Blind Portion of Cabinet 8 19 Door Opening Full Height Blind Left Shown with adjacent cabinet Coin mort 3 4 M5x6mm flat-heade
Item No. 5PSP-18 PANELS CHECK LIST Description QTY A B C D E Base Frame Foot Guide channel Basket 4 2. 2 B 2. 3. D 1 Handle volante para apertura2de mano 4 2 M4x10mm flat-headed screw 2 izquierda (Fig E) 3 M6x10mm wafer head screw 8 4 M5x6mm flat-headed screw 8 Sujete el x18mm pie (C) usando 5 5/32 wood screw 19 el 3. E A 3. C Fig E) 1 FITTINGS CHECK LIST 3 QTY del Ajuste laDescription posición frontal K LIST tornillo (3) (Fig F) QTY 1 3 5 D C Fig F) 1.
4 M5x6mm flat-headed screw 5 5/32 x18mm wood screw Door Opening C D E Foot 1 Puerta/ Porte Guide channel 1 Basket 4 (Right) Full Height Blind Left Shown with adjacent cabinet C 1 2 B 5PSP-15 (APERTURA DE PUERTA PARA MANO DERECHA/15”) 5PSP-15 (PORTE VERS LE CÔTÉ DROIT/OUVERTURE DE 15”) Door Opening A (Right) Fig A) 2 Handle Base de montaje (Fig A) 4 M4x10mm flat-headed screw 2 M6x10mm wafer head screw 8 Nota: Si está instalando dentro M5x6mm flat-headed screw 8 5 de un gabinete con marco, la
20B-02114102 2. 3. C Fig E) 4 .3 E 2. 3 Sujete el pie (C) usando el C B 3 C Persiana 4. mort Coin 1 B Puerta/ Porte 5. )mm753( ”41 D 4. 5. E Fig G) .3 1. D (Left) 10” (256mm) 5 (Left) .4 7-1/4 ” (184mm) 4 4 Fig H1) A 2 Fig H2) Fije los ganchos (sólo versión12” Gris Orion) (305mm) D 1. 1 7-1/4 ” (184mm) 4 E 2 1 12” (305mm) 3. 2/1 5 D .
1 QTY 192 2 8 8 19 2 4 Door Opening Door Opening A Full Height Blind Right 3 4 Door Opening Full Height Blind Right Full Height Blind Left Shown with adjacent cabinet 5 2 3 4 5 D M4x10mm flat-headed screw 2 M6x10mm wafer head screw 8 M5x6mm flat-headed screw 8 5/32 x18mm wood screw 19 4 5 Full Height Blind Left (Left) Shown with adjacent cabinet 5PSP-18 (APERTURA DE PUERTA PARA MANO IZQUIERDA/18”) D 5PSP-18 (PORTE VERS LE CÔTÉ GAUCHE/OUVERTURE DE 18”) Blind Portion of Cabinet Blind P
2. Item No. 5PSP-18 Guide channel Basket 4 1 1 1 1 4 FITTINGS CHECK LIST Description QTY B Fig E) 2. 2 2. 3. 3 Ajuste la posición frontal del 2 1 Handle volante para apertura de mano 4 2 M4x10mm flat-headed screw 2 izquierda (Fig E) screw 8 3 M6x10mm wafer head 4 M5x6mm flat-headed screw 8 3. E A D 3 5 5 5/32 wood screw 19 el Sujete el x18mm pie (C) usando K LIST tornillo (3) (Fig F) QTY 1 Réglez la position de la roue 1 avant pour une ouverture vers 1 la gauche. (Fig E) (Left) 1.
Door Opening Full Height Blind Left Persiana Blind Portion Coin mort of Cabinet D E 1 1 Puerta/ Porte Guide channel 1 Basket 4 4 M5x6mm flat-headed screw 5 5/32 x18mm wood screw Door Opening 5 Full Height Blind Left Shown with adjacent cabinet 2 (Right) C 1 B 5PSP-18 (APERTURA DE PUERTA PARA MANO DERECHA/18”) 5PSP-18 (PORTE VERS LE CÔTÉ DROIT/OUVERTURE DE 18”) A Door Opening (Right) 2 Handle Base de montaje (Fig A) 4 M4x10mm flat-headed screw 2 M6x10mm wafer head screw 8 Nota: Si está insta
3. Fig E) .3 4 E 2. 3 C 3 les pieds (C) à la base (A) Fixez à l’aide de la vis (4) (Fig G) 4 3 2 C 4.mort Coin 1 B Puerta/ Porte E ”4/1-7 )mm652( ”01 )mm481( 3 Persiana A 3 B 3 1 Asegure el pie (C) a la base (A) 5 usando tornillo (4) (Fig G) Fig F) .1 B Réglez la position de la roue avant pourDl’ouverture vers la droite (Fig E) 2 Fixez les pieds (C) en A utilisant la vis (3) (Fig F) 5 .2 D Sujete el pie (C) usando el 4 2 B 3.
12400 Earl Jones Way, Louisville, KY 40299 (800) 626-1126 www.rev-a-shelf.