Instructions / Assembly

INSTALLATION INSTRUCTIONS: REV-A-MOTION™ KIT FOR TOP MOUNT WASTE CONTAINERS 5
Locate the bottom of the side mounting
bracket which is 15-3/4” (50 qt. version) or
10-11/16” (35 qt. version) from the oor (See
Fig 1.1). The brackets also need to be ush
with the front of the cabinet wall.
NOTE: If system holes are available, move
the bracket up or down to the nearest set
of system holes. Use the (3) M6x3 at head
euro screws for each side mounting bracket
with the corresponding 32mm system hole
(See Fig 1.2).
NOTE: Make sure to adjust the rear bracket
dimensions accordingly if you are using
system holes
INSTALLING SIDE
MOUNT BRACKETS
STEP 1
FIGURE 1.1 FIGURE 1.2
FRAMELESS CABINET APPLICATION
15-3/4” (50 QT.)
10-11/16” (35 QT.)
15-3/4” (50 QT.)
10-11/16” (35 QT.)
IN THIS EXAMPLE,
ADD THIS DISTANCE
TO ACCOMPANYING
DIMENSIONS
SYSTEM HOLES
ATTACHING THE REAR
MOUNTING STRAP
STEP 2
NOTE: If rear cabinet wall is less than 1/2”
thick, the use of a furring strip may be
necessary (See Fig 2.1).
Position the rear strap assembly as shown in
Fig 2.2. Be sure it’s centered on the back wall
and elevated so the center slot of each rear
socket is positioned 17-15/16” (50 qt. version)
or 12-7/8” (35 qt. version) from the cabinet
oor (See Fig 2.3).
Fasten the rear strap assembly to the rear
cabinet wall using the (4) #8 x 5/8” pan head
screws provided. We recommend starting
with (2) screws in the center slots in case
adjustments are necessary.
NOTE: Make sure to adjust the rear bracket
dimensions accordingly if you are using
system holes
#2
PH
#2
PH
FIGURE 2.2
FIGURE 2.3
FIGURE 2.1
CENTER
APPLY FURRING
STRIP IF
NECESSARY
17-15/16” (50 QT.)
12-7/8” (35 QT.)