Manual
Operating the machine
21
• Close the waste gas / overflow valve (V3).
Pos: 6.18 /00005 Ü berschriften/ 1.1 Überschrifte n/1.1 Überschrift en BDA/11 Druc kaufbau @ 1 \mod_12404 00926229_9.doc @ 8240 @ @ 1
4.7 Pressure build-up
Pos: 6.19 /00010 Bedienungsa nleitungen Kapitels ammlungen/Cr yoMill/0016 LN2 Dewar 5 0l/1604 Modul De war 50l Drucka ufbau @ 2\ mod_1267701477 789_9.doc @ 18841 @ @ 1
• Close the withdrawal valve (V1) and the waste gas / overflow valve (V3).
• Open the pressure build-up valve (V2).
• Watch the pressure indicator (DM).
• Close the pressure build-up valve (V2) as soon as the needle reaches the
red marking or nitrogen comes out of the pressure relief valve (PSV).
Fig. 6: Pressure gauge
Pos: 6.20 /00005 Ü berschriften/ 1.1 Überschrifte n/1.1 Überschrif ten BDA/11 E ntnahme von Flüs sigstickstoff @ 2\mod_126 7774957314_9. doc @ 18877 @ @ 1
4.8 Withdrawal of liquid nitrogen
Pos: 6.21 /00010 Bedienungsa nleitungen Kapitels ammlungen/Cr yoMill/0016 LN 2 Dewar 50l/16 05 Modul Dewar 50l Entna hme Flüssigstic kstoff @ 2\ mod_126770907251 7_9.doc @ 18 855 @ @ 1
• Attach the liquid nitrogen line to the CryoMill and to the connection (SA).
• Open the filling and withdrawal valve (V1).
• After taking the liquid, close the filling and withdrawal valve (V1) again.
Pos: 6.22 /00005 Ü berschriften/ 1.1 Überschrifte n/1.1 Überschrift en BDA/11 Druc kentlastung @ 2\mod_12 67777113490 _9.doc @ 18891 @ @ 1
4.9 Pressure relief
Pos: 6.23 /00010 Bedienungsa nleitungen Kapitels ammlungen/Cr yoMill/0016 LN2 Dewar 5 0l/1606 Modul De war 50l Drucke ntlastung @ 2\ mod_1267709 470983_9.doc @ 18862 @ @ 1
• Close the pressure build-up valve (V2).
• Open the waste gas valve (V3).
Pos: 6.24 /00005 Ü berschriften/ 1.1 Überschrifte n/1.1 Überschrift en BDA/11 Tr ansport @ 0\m od_12264951 64391_9.doc @ 3398 @ 2 @ 1
4.10 Transport
Pos: 6.25 /00004 Warnhinweis e/V0019 VORSICHT Überdruc k im Behälter - G efärdung durc h LN2 @ 2\m od_1267775099 915_9.doc @ 1 8884 @ @ 1
CAUTION
Risks of liquid or gaseous nitrogen
Positive pressure in the vessel
– The introduction of energy during transport can cause a sudden surge in
pressure. Nitrogen is blown off then and this can cause a lack of oxygen,
cryogenic burns, oxygen enrichment and associated risks.
• Make sure the vessel is depressurised before you transport it,
• Remove the siphon and put in the transport plugs.
• Transport the vessel only in an upright position.
• Avoid impacts and vibrations.
• Secure the vessel against falling down, rolling away and damage.
Pos: 6.26 /00005 Ü berschriften/ 1. Überschriften/ 1 Prüfanweisu ngen @ 1\ mod_12452308964 41_9.doc @ 11 114 @ @ 1
Pos: 6.27 /00010 Bedienungsa nleitungen Kapitels ammlungen/Cr yoMill/0016 LN 2 Dewar 50l/16 12 Modul Dewar 50l Verboten ist die An wendung folgender Mi ttel und @ 2\mod_1268 231540473_9.doc @ 18957 @ @ 1
It is impermissible to use the following agents and tools:
• pliers
• striking tools
DM