Installation Manual
Pg. 2
STEP 2: Install the rails to canister
Rear attachment rail
Front attachment rail tab
Bearings enter
channel of rail
here
Lift up lock cover and open lock by pressing release button.
Pull cover out 6”- 8”. DO NOT allow cover to roll back into canister until rail is installed.
POWERTRAX motor is not
active yet, manually guide
the cover into the rails.
STEP 3: Install the front cover
Slide on front cover and attach here on both
sides with the (2) 10-24 x 3/4” screws. Use
the 1/8” Allen wrench.
STEP 1: Remove Shipping Materials
Remove shipping
brackets and white
shipping tubes from
both sides of canister.
Keep shipping bracket
for STEP 4
STEP 4: Lift the assembled cover into the bed and
position the rails
Attach both rails to
canister using the
10-32 x 7/16” rail
to canister
mounting screws.
Make certain the
rail tabs are on the
inside of the spiral.
Passenger rail has green sticker.
Using two people, lift the cover and place it at the very front
of the bed. Close the tailgate of the pickup.
1/8”
gap
Tailgate
Protector
Tailgate
Move the rails to
achieve the 1/8” gap
using the 1/8” part
at the top of the
bracket. Make
certain the rails do
not move after
measuring.