Ensure that all power is
switched off before
installing or maintaining
this product
Revision 2.7 Page 78 of 83
Mercury Plant Controller Installation Guide
Installation:
Mounting on to a DIN rail
Clearances:
The controller must have 10mm clearance above the top and 15mm clearance from the sides. Clearance at the
front and rear is dependent on the site wiring.
There is no requirement for forced cooling ventilation
Cleaning:
Do not wet the controller when cleaning. Clean the front by wiping with a slightly damped lint free cloth.
Please note: The specifications of the product detailed on this set up guide may change without notice.
RDM Ltd shall not be liable for errors or for incidental or consequential damages, directly or indirectly, in
connection with the furnishing, performance or misuse of this product or document.