Please align the arrow and install A into B. Please follow the direction “CLOSE” and rotate it to lock. 8. Top cover cable hole covers 0.4In 0.
4 1 3 Side Glass Back Glass Install the threaded metal tubes provided to the base. Frist Check the Numbers and Arrow marks on the metal tube, And firmly screw the metal tubes in trun onto the base of the terrarium. 4 3 3 4 6. Split one full set into 3 separate parts. 2 1 1 2 2 A A top top front B1 B B2 Put B1 outside of terrarium and B2 inside of terrarium and then rotate B2 clockwise.