Operation Manual
Extension Lead Length (m) Min Wire ø (mm²)
30m 2.5
50m 4.0
2. Transporng Machine
1. Install & ghten ring bolt securely.
2. Check liing arm bolts to ensure bolts are securely fastened.
3. Secure liing chain below liing arms and through ring bolt to prevent excess movement
during transport.
4. Ensure all machinery & equipment used to transport the machine are rated for required loads.
Ring Bolt
Liing Arm
(each corner)
3. Specicaons & Parts
Power Supply:
Ensure machine is connected to correct power supply (check machine label to conrm power
supply).
Extension Leads:
Where possible, connect machine directly to power outlet. If an extension lead is required,
ensure lead is under 50m in length. Minimum extension lead diameter are prescribed below:










