How to Guide

Operation
2. Check for Clearanceverify that there is sufficient room to run wires, as well as clearance
above and below the controller for ventilation. The clearance should be at least 6 inches (150mm).
3. Mark Holes
4. Drill Holes
5. Secure the charge controller.
Rover is very simple to use. Simply connect the batteries, and the controller will automatically
determine the battery voltage. The controller comes equipped with an LCD screen and 4 buttons
to maneuver though the menus.
Startup Interface