Full Product Manual
14
Operation
2. Check for Clearance—verify that there is sufficient room to run wires, as well as clearance 
above and below the controller for ventilation. The clearance should be at least 6 inches (150mm). 
3. Mark Holes 
4. Drill Holes 
5. Secure the charge controller. 
Rover is very simple to use. Simply connect the batteries, and the controller will automatically 
determine the battery voltage. The controller comes equipped with an LCD screen and 4 buttons 
to maneuver though the menus. 
Startup Interface










