Technical information

18
GRD Break ..........................OK
controlling circuits in the E6000
Setting up, please wait..
(normal completion).
WPT Break ..........................OK
11) Testing Internal ROM Write-Protect :
Shows the check results
Setting up, please wait..
for the internal ROM write-
Write-Protect ......................OK
protection controlling
circuits in the E6000
(normal completion).
12) Testing Hardware Break :
Shows the check results for
Setting up, please wait..
the hardware break control
A)Break Point Intialised .............OK
circuits in the E6000 (normal
B)Event Detectors CES channel 1-12 ...OK
completion).
C)Test Sequencing 1 ..................OK
D)Check Range Break ..................OK
E)Check Range Break for Data .........OK
F)Check Compare Either ...............OK
13) Testing Emulation RAM Trace :
Shows the check results for
Setting up, please wait..
the trace controlling circuits
A)Free Trace Test ....................OK
in the E6000 (normal
B)Range Trace Test ...................OK
completion).
C)Point to Point Trace Test ..........OK
D)Start and Stop Event Trace Test ....OK
F)Time STAMP Trace Test ..............OK
Time STAMP Trace Test 1 ............OK
Time STAMP Trace Test 2 ............OK
Time STAMP Trace Test 3 ............OK
14) Testing Runtime counter :
Shows the check results for
Setting up, please wait..
the run-time counter in the
Testing Internal Clock = 16.0 MHz ....OK
E6000
Testing Internal Clock = 12.5 MHz ....OK
(normal completion).
Testing Internal Clock = 10.0 MHz ....OK
Testing Internal Clock = 8.0 MHz.....OK
15) Testing Emulation Monitor :
Shows the check results for
Setting up, please wait..
the emulation monitor
A)
EMA23-EMA0(MONIT00:D7-D0,MONIT10,E:D7-D0)TEST
..OK
controlling circuits in the
B)ACST2-ACST0(MONIT0E:D2-D0)TEST............OK
E6000
C)ST3-ST0(MONIT2E:D3-D0)TEST................OK
(normal completion).
D)BRKACK(MONIT0E:D7)TEST....................OK
E)CNN(MONIT3E:D1)TEST.......................OK
F)NOCLK(MONIT3E:D2)TEST.....................OK
16) Testing PERM_GA :
Shows the check results
Setting up, please wait..
for the performance
A)Time Measure Test .........................OK
analysis controlling
B)PERM_POINT TO POINT Time Measure Test .....OK
circuits in the E6000