Operating Guide

©2017 Pinnacle Climate Technologies 5 Vent-Free Gas Heater Users Manual
Before beginning assembly or operation of this heater, ensure all parts are present. Check the parts against
the package contents list. If any part is missing or damaged, do not attempt to assemble, install, or operate
the heater. Contact customer service for replacement parts.
Estimated Assembly Time: 1 to 2 hours
Tools Required for Assembly (not included, unless otherwise stated):
Before installing the heater, ensure you have the following:
Hardware package (included)
Approved exible gas hose if allowed by local codes
Sealant (resistant to natural or propane/LP gas)
Electric drill with 3/16" drill bit
Phillips screwdriver
External regulator (supplied by installer if required)
Piping (check local codes)
Equipment shuto valve
Test gauge connection
Sediment trap
Tee joint
Pipe wrench
3/8" NPT to 3/8" are tting
Failure to position the parts in accordance with these diagrams or failure to use only parts
specically approved with this heater may result in property damage or personal injury.
WARNING
QUALIFIED INSTALLING AGENCY: Only a qualied agency should install and replace gas piping, gas
utilization equipment, or accessories, and/or repair and service such equipment. “Qualied agency means
any entity that either in person or through a representative is engaged in and is responsible for:
Installing, testing, or replacing gas piping; or
Connecting, installing, testing, repairing, or servicing equipment; is experienced in such work; is familiar with
all precautions required; and has complied with all the requirements of the authority having jurisdiction.
Safety Information (cont.)
UNPACKING
1. Remove heater and base from the carton.
2. Remove all protective packaging used on the heater.
3. Inspect the items for shipping damage. If you notice any damage, contact the dealer where the heater
was purchased.