Technical data

8
remeha W40/60-m ECO
5.1.2 Installation of multiple boilers
Multiple boilers are idealy suited for use in larger com-
mercial buildings and offer a wide variety of application
possibilities (see principle drawing).
Fig. 05 Principle drawing multiple boilers
For further advice or information refer to the Technical
Information "Multiple Units".
Contact Broag Ltd.
Table
1. rematic
®
4-step weather compensator (Master)
Step 1 till 4
2. rematic
®
4-step modular controller (Slave)
Step 5 till 8
3. Pump (to be set at position 1)
4. Safety valve
5. Three-way valve, 230 V (D.H.W.)
6. Non-return valve
7. Expansion vessel (if required)
8. Manual isolating valve
9. Automatic vent
10. Open header (neutral header)
11. Drain cock
12. Installation pump
13. Installation expansion vessel
14. Flow sensor
15. Outdoor sensor
16. D.H.W. storage
D.H.W.
No. of units
2
3
4
'D'
'd'
80
100
125
32
38
50
remeha W40-m ECO
250
250
300
H
No. of units
2
3
4
'D'
'd'
100
125
150
50
63
63
remeha W60-m ECO
300
400
500
H