Instruction manual

16.
Shut down the valve controlling water supply to
the Deluge Valve. Relieve the inlet pressure by
opening the 1¼” drain valve B (Fig. 6). Close the
valve A (Fig. 6) that supplies water to the push rod
chamber, and open the Model B Manual Emer-
gency Station, valve D (Fig. 6).
Remove the trim at the unions nearest to the push
rod chamber cover (#3, Fig. 5).
Take the push rod chamber cover (#3, Fig. 5) off
by removing the six retaining screws (#26, Fig.
5).
CONDITION ONE (Water coming out of the
bleed hole):
Water coming out of the bleed hole is caused by a
leaking diaphragm (#18, Fig. 5). Visually inspect
the push rod chamber cover (#3, Fig. 5) and pis-
ton (#17, Fig. 5) to determine what could have
damaged the diaphragm and correct. Install a
new diaphragm. NOTE: The diaphragm has two
different surfaces, it is not bi-directional. It will fail
if installed backwards! Roll the diaphragm so that
the smooth surface (the pressure side) conforms
to the inside of the push rod chamber cover and
reassemble the six retaining screws (#26, Fig. 5)
with an installation torque of 15 foot-pounds. Set
up the Model DDX Deluge Valve as per the sec-
tion “Resetting the Single Interlock Preaction Sys-
tem.”
a.
b.
c.
CONDITION TWO (System Air coming out of
the bleed hole):
System air coming out of the bleed hole is caused
by a defective O-ring assembled to the push rod
guide (#11, Fig. 5). Remove the piston-push rod
subassembly, push rod spring (#34, Fig. 5), and
push rod guide (#11, Fig. 5). Verify by hand turn-
ing, that the push rod cannot be unscrewed from
the piston. Replace all O-rings and the push rod
guide (#21 & #22, Fig. 5). The correct installation
torque for the push rod guide is 35 inch-pounds.
CAUTION: Do not over tighten the push rod
guide. Reassemble the components that were ini-
tially removed. Re-install the diaphragm (#18, Fig.
5) if it appears to be in good shape, otherwise,
replace it also. NOTE: The diaphragm has two dif-
ferent surfaces. It is not bi-directional. It will fail if
installed backwards! Roll the diaphragm so that
the smooth surface (the pressure side) conforms
to the inside of the push rod chamber cover and
reassemble the six retaining screws (#26, Fig. 5)
with an installation torque of 15 foot-pounds. Set
up the Model DDX Deluge Valve as per the sec-
tion “Resetting the Single Interlock Preaction Sys-
tem”.