Installation manual

Regency Freestanding Woodstove
17


Remove the door from the stove and remove
the glass retainer. Position the glass in the door,
make sure that the glass gasketing will properly
seal your unit, and replace the retainer, it should
rest on the gasket not the glass. Tighten securely,
but do not wrench down on the glass as this
may cause the glass to break.

Firebrick is included to extend the life of your
stove and radiate heat more evenly. Check to
see that all rebricks are in their correct posi-
tions and have not become misaligned during
shipping.
The "AD" brick in the drawings below is the brick
covering the Ash Dump hole that is used when
the Ash Drawer Kit is installed.

Attach spring handle by rotating counter clock-
wise onto rod. Ensure that the rod ts into the
entire length of the spring handle (refer to the
Diagram below).




The pieces listed below can be purchased and
installed during the initial installation or added
on later.

 Remove the bricks from the oor of the
rebox.
 If using ashdrawer, discard cover plate.
 Remove the ash dump cover plates (one
inside the rebox and one on the underside
of the rebox) by removing the two nuts and
bolts holding the 2 plates together from inside
the rebox.
 Push the ash plug into the hole inside the
rebox and replace all the bricks except for
the brick over the ash plug (refer to the brick
diagram in the Brick Installation section).
 Place the ash drawer lid inside the pedestal,
and the ash plug tool beside the lid, then
slide the ash drawer inside so it sits on top
of the lid.

Hook screen to the inside on the right side
of the rebox door opening. Lock in place by
turning handle.
Back Side of Screen Shown
Refer to the Ash Drawer Operating Guidelines
in the Operating Instructions section.


 Remove the bricks from the oor of the
rebox.
 Remove and discard the cover plate by
removing the two screws on the front of the
Bottom Shield.
 Remove the ash dump cover plates (one
inside the rebox and one on the underside
of the rebox) by removing the two nuts and
bolts holding the 2 plates together from inside
the rebox.
 Push the ash plug into the hole inside the
rebox and replace all the bricks except
for the brick over the ash plug (see brick
diagram in the Brick Installation section).
 Place the ash plug tool beside the lid, then
slide the ash drawer inside.
Refer to Ash Drawer Operating Guidelines in
the Operating Instructions section.
 The handle must be positioned at 10
o'clock when closed to avoid the handle from
getting hot and to ensure the screen stays in
place.
Handle Lock
Hooks
Handle at 10 o'clock position.