Installation manual
Regency Freestanding Woodstove
17
Remove the door from the stove and remove 
the glass retainer. Position the glass in the door, 
make sure that the glass gasketing will properly 
seal your unit, and replace the retainer, it should 
rest on the gasket not the glass. Tighten securely, 
but do not wrench down on the glass as this 
may cause the glass to break.
Firebrick is included to extend the life of your 
stove and radiate heat more evenly. Check to 
see that all rebricks are in their correct posi-
tions and have not become misaligned during 
shipping.
The "AD" brick in the drawings below is the brick 
covering the Ash Dump hole that is used when 
the Ash Drawer Kit is installed. 
Attach spring handle by rotating counter clock-
wise onto rod. Ensure that the rod ts into the 
entire length of the spring handle (refer to the 
Diagram below).
The pieces listed below can be purchased and 
installed during the initial installation or added 
on later.
  Remove  the  bricks  from  the  oor  of  the 
rebox.
 If using ashdrawer, discard cover plate.
  Remove the  ash  dump cover  plates (one 
inside the rebox and one on the underside 
of the rebox) by removing the two nuts and 
bolts holding the 2 plates together from inside 
the rebox.
  Push the ash plug into the hole inside the 
rebox and replace all the bricks except for 
the brick over the ash plug (refer to the  brick 
diagram in the Brick Installation section).
 Place the ash drawer lid inside the pedestal, 
and the ash plug tool  beside the lid, then 
slide the ash drawer inside so it sits on top 
of the lid. 
Hook  screen  to  the  inside  on  the  right  side 
of the rebox door opening. Lock in place by 
turning handle.
Back Side of Screen Shown
Refer to the Ash Drawer Operating Guidelines 
in the Operating Instructions section.
  Remove  the  bricks  from  the  oor  of  the 
rebox.
 Remove  and  discard  the  cover plate  by 
removing the two screws on the front of the 
Bottom Shield.
  Remove the  ash  dump cover  plates (one 
inside the rebox and one on the underside 
of the rebox) by removing the two nuts and 
bolts holding the 2 plates together from inside 
the rebox.
  Push the ash plug into the hole inside the 
rebox  and  replace  all  the  bricks  except 
for the  brick  over the  ash  plug (see  brick 
diagram in the Brick Installation section).
 Place the ash plug tool beside the lid, then 
slide the ash drawer inside.
Refer to Ash  Drawer  Operating Guidelines in 
the Operating Instructions section.
 The handle must  be  positioned at 10 
o'clock when closed to avoid the handle from 
getting hot and to ensure the screen stays in 
place.
Handle Lock
Hooks
Handle at 10 o'clock position.










