Installation Instructions

Recommended Products:
Reflective/Bubble/Bubble/White - Roll: RDBW48100 (48”x 100’)
Open Interior
R-3.5* Heat Flow Horizontal
Installation Instructions:
The Reflectix
®
Insulation is installed with the “white side” towards the interior of the building.
Install 1”x 2” furring strips on the inside and perpendicular to the Z girts on 22” centers. Utilize 1
1/4” self-tapping sheet metal screws to secure the furring strips to the Z girts.
Butt the furring strips together and tape. Staple tape for reinforcement.
Attach the product using 5/16” staples at approximately 4” intervals.
Staple the edges of the Reflectix
®
Reflective/Bubble/Bubble/White product to the furring strips with a
3/4” overlap at the seams.
Tape the seams with a Reflectix
®
White Poly Tape (goal is an air-tight, snug seam seal).
Staple product down the middle of the sheet into the furring strip parallel and centered.
* Includes thermal resistance of 0.68 interior air film.
1. Reflectix
®
Insulation
2. Exterior Wall Panel
3. Girt
4. 1”x 2” (Nominal)
Furring Strip
5. Red Metal (Structural
Frame)
Tools Required:
Safety Glasses
Tape Measure
Utility Knife
Screw Gun
Staple Gun
Metal Building / Wall / Retrofit
Reflectix Installation Instructions
2
1
3
5
4