Installation Guide

Recommended Products:
Reflective/Bubble/Bubble/White - Roll: RDBW48100 (48”x 100’)
Bottom of the Trusses
Open Interior
R-6.6* Heat Flow Down | R-3.0* Heat Flow Up
Installation Instructions:
The Reflectix
®
Insulation is installed with the “white side” towards the interior of the building.
Pre-installation inspection - Check the roof area for clutter, water sprinklers, conduit and lights.
Sprinkler systems are especially important. All water pipes must be below the Reflectix
®
Reflective/Bubble/Bubble/White Insulation to prevent the possibility of freezing in the winter.
Nail 1”x 2” furring strips on the bottom of and perpendicular to the trusses on 22” centers. (Note:
When truss spacing is 24” it is recommended to install the Reflectix
®
Reflective/Bubble/Bubble/White
48” product directly to the bottom cord of the truss.)
Butt the furring strips together and tape. Staple tape for reinforcement.
Staple the edges of the Reflectix
®
to the furring strip with 5/16” staples at approximately 4” intervals.
Run subsequent courses of the product with a 3/4” overlap at the seams.
1. Reflectix
®
Insulation
2. Exterior Roof Panel
3. Purlin
4. Truss
5. 1”x 2” (Nominal)
Furring Strip
Tools Required:
Safety Glasses
Tape Measure
Utility Knife
Staple Gun
PF Bldg / Roof / Retro / Bottom of Trusses
Reflectix Installation Instructions
2
1
5
3
4