Installation Manual

z 2006,2007,2008,2009,2010,2011,2012,2013, 2014 Cequent Performance Products, Inc.
Made in China
30035IN 10/20/2014 Rev. T
NOTE:
Must install center bolt in
one of the center holes in
each rail.
Check to make sure center
bolt does not interfere with
bed sill.
Chevrolet 73 to 87 / 73 to 92 4-door (GMC) (34” Straight, with Outside Shock Absorbers)
1/4 1.5-3
1/4 2
*
34-7/8” Long Box
And Short Box
Side Bracket
Front
of
Vehicle
Rear Edge of
Truck Bed
* Optional weld
pattern
Drivers side of 1/2 ton Chevy Long Box Shown
King Pin Center approx.. 3-1/2”
forward of Axle Center
DO NOT Torque to 85lb-ft
(tighten but do not crush bed sill)
Install spacer with 1/2” hole between frame and
bed. (Cut provided tube spacer down to fit snug
between frame and bed.)
Long bracket
Measure from Rear Edge of truck
bed to rear edge of base rail.
ROW 1
ROW 2
ROW 3
ROW 4
Axle Center
Bed Sill
CAUTION!
Read pages 2-3 of these instructions before starting installation. Failure to do so could result in significant vehicle damage!
CAUTION!
Check for obstructions before drilling. Failure to do so could result in damaged fuel or brake lines, structural members, etc.
CEQUENT PERFORMANCE PRODUCTS, INC. does its best to communicate tow vehicle manufacturer changes; however, it is
ultimately the responsibility of the installer to prevent damage due to installation.
SHEET 7 0F 19
Drill through
bed and truck
frame
Front of
Vehicle