Installation Guide
6 RDQCI5000-12032020
3
5
4
6
Move the assembled frame into position on the threshold, push the side rails tight to the walls to
compensate for any out-of-plumb conditions. Push the bottom rail down tight to the threshold and
adjust the frame to a vertical position. After confirming your position with a level, mark your wall
through the frames pre-drilled holes.
Remove your frame from the shower enclosure and drill into your pre-marked holes. Insert anchors
(K) into the wall. Now place your frame back into your shower enclosure and screw your frame into
place using the provided screws (J).