Installation Guide
RDQCI5285 Rev. 0 Page 6 Cered 06/01/2016
RDQCI5285 Rev 0 Page 6 Cered 06/17/2016
Note: It is critical that the threshold
U-Channel is centered on the centerline.
Remove u-channels from the hardware box and countersink holes in the u-channels. Each piece of
u-channel requires a minimum of two (2) screws, 3” from each end for lengths less than 18”.
Lengths 18” or greater also require screws approximately every 18”-24.
Each piece of u-channel is cut to length and mitered as necessary. Position each piece of u-channel
along the threshold centerline and use low-tack tape to hold in place. Check that each piece of u-
channel fits in location along the marked centerlines and mitered joints fit tightly.
In the event the u-channel doesn’t fit properly, contact Technical Support.
If your unit was ordered with a notch panel, please see appendix “A” for supplemental installation
instructions.
Reference the unit drawing shipped with the unit to
determine where each stationary glass panel is to be
located.
With a pencil, carefully mark each hole position on
the threshold centerline. Remove the U-Channel and
drill a 3/16” diameter hole, approximately 1-1/2”
deep, at the marked locations.
*If using a Tile Ready® brand shower pan, please refer to the attached Tile Ready® Brand
Shower Pan Installation Addendum for important instructions to ensure a leak-proof
installation.
*