Manual
5
1
2
3
4
Alternator
B+ Connection
1 INSTALLATION
STEP 2.
Wire the power and ground connections in the order shown below.
TORQUE: 20Nm
ENSURE THAT ALL WIRES ARE TERMINATED CORRECTLY.
ENSURE THE SWITCH IS IN THE OFF POSITION (MARKED ‘0’) BEFORE COMMENCING THIS STEP.
THE ALTERNATOR B+ CONNECTION IS TO BE CONNECTED TO THE VEHICLE POSITIVE (TERMINAL
3
). NO
ADDITIONAL WASHERS TO BE USED ON THE TERMINALS. ENSURE CABLES ARE ALIGNED PROPERLY SO
THEY DO NOT INTERFERE WITH RED COVER.