USE AND MAINTENANCE MANUAL
Via La Croce 8, I - 33074 Vigonovo di Fontanafredda (PN) Italy. Via La Croce 8, I - 33074 Vigonovo di Fontanafredda (PN) Italy. 09 09 EN 14785 - 2006 EN 14785 - 2006 Art. 15a B-VG - VKF AEAI Regensburger und Münchener BStV erfüllt. Art. 15a B-VG - VKF AEAI Regensburger und Münchener BStV erfüllt.
Via La Croce 8, I - 33074 Vigonovo di Fontanafredda (PN) Italy. Via La Croce 8, I - 33074 Vigonovo di Fontanafredda (PN) Italy. 10 10 EN 14785 - 2006 EN 14785 - 2006 Art. 15a B-VG - VKF AEAI Regensburger und Münchener BStV erfüllt. Art. 15a B-VG - VKF AEAI Regensburger und Münchener BStV erfüllt.
red PELLET STOVES INSTALLATION AND USE MANUAL Contents page 4 INTRODUCTION .................................................................................................................................... 6 1. WARNINGS AND GUARANTEE CONDITIONS..................................................................................... 7 1.1. SAFETY INSTRUCTIONS ..................................................................................................................7 1.2. OPERATING WARNINGS ..........
red 4.17. 4.18. PELLET STOVES INSTALLATION AND USE MANUAL Contents page 5 Shutdown mode due to alarm ..................................................................................................... 39 Exiting alarm condition ............................................................................................................... 39 5. MAINTENANCE AND CLEANING ...................................................................................................... 40 5.1.
red PELLET STOVES Chapter 1 INSTALLATION AND USE MANUAL page INTRODUCTION Dear Customer, We wish to thank you for choosing one of our products, specifically a stove from the Pellet line. In order to get the best performance from your stove and to enjoy to the full the warmth and the sense of well-being which the flame will diffuse through the home, we recommend that you read this booklet carefully before lighting the s tove for the first time.
red PELLET STOVES Chapter 1 INSTALLATION AND USE MANUAL page 1. WARNINGS AND GUARANTEE CONDITIONS 1.1. SAFETY INSTRUCTIONS Installation of the stove, making the electrical connections, checking its operation, and maintenance are all tasks which should be carried out by qualified and authorised personnel. Install the stove in accordance with the regulations in force in your local area, region and country.
red 1.2. PELLET STOVES Chapter 1 INSTALLATION AND USE MANUAL Before carrying out any cleaning or maintenance operation, make sure in advance that the stove is disconnected from the mains electricity supply, by turning off the main switch located on the back of the stove, or by unplugging the supply cable. The stove must be electrically connected to a system equipped with an effective earth conductor. The system must be of adequate rated capacity for the stated electrical power of the stove.
red PELLET STOVES Chapter 1 INSTALLATION AND USE MANUAL page INFORMATION 1.3. For any problems, please contact your dealer or company qualified and authorised personnel and always request original spare parts for repairs. Only use the fuel recommended by the company (for ITALY only 6mm diameter pellets whereas for the other European countries, pellets with a diameter of 6-8 mm) and only supplied by the automatic feed system.
red PELLET STOVES Chapter 1 INSTALLATION AND USE MANUAL page The company is not liable for any damages caused directly or indirectly, to persons, animals or objects consequent to the non-observance of all the instructions given in this manual, especially the cautions relating to installation, use and maintenance. If the product does not perform correctly, contact your local retailer and/or importer. Damage caused by transport and/or handling is excluded from the guarantee.
red PELLET STOVES Chapter 2 INSTALLATION AND USE MANUAL page 2. Theoretical notions for installation 2.1. Pellets Wood pellets are manufactured by hot-extruding compressed sawdust which is produced during the working of natural dried wood. The compactness of the material comes from the lignin which is contained in the wood itself, and allows the production of pellets without the use of glues or binders.
red PELLET STOVES Chapter 2 INSTALLATION AND USE MANUAL page The company strongly recommends the use of certified fuel for its stoves (DINplus and Ö-Norm M7135). The use of fuel of inferior quality or not conforming to the specification given above compromises the running of your stove and can therefore lead to the termination of the guarantee and of the manufacturer's responsibility for the product.
red 2.3. PELLET STOVES Chapter 2 INSTALLATION AND USE MANUAL page OPERATING AREA For proper functioning and a good temperature distribution, the stove should be positioned in a location where it is able to take in the air necessary for combustion of the pellets (about 40 m3/h must be available), as laid down in the standard governing the installation and in accordance with local national standards. The volume of the room must not be less than 30 m3.
PELLET STOVES red Chapter 2 INSTALLATION AND USE MANUAL page 14 It is not compulsory to connect the air intake directly with the stove (so that it draws air directly from outside), but it is essential at all events to ensure an airflow of 50 cubic metres per hour by the use of a hole of the dimensions given. See standard UNI 10683. 2.5.
red 2.6. PELLET STOVES Chapter 2 INSTALLATION AND USE MANUAL page CONNECTION TO THE FLUE PIPE The flue pipe must have internal dimensions not larger than 20 x 20 cm, or diameter 20 cm. In the event of larger dimensions, or of the flue pipe being in poor condition (for example cracks, poor insulation, etc.), it is advisable to fit a stainless steel pipe of suitable diameter inside the flue pipe throughout its length, right up to the top.
red PELLET STOVES Chapter 2 INSTALLATION AND USE MANUAL page 16 This type of connection ensures the evacuation of the fumes even in the event of a temporary power cut. 2.9. OPERATING PROBLEMS CAUSED BY DRAUGHT DEFECTS IN THE FLUE Of all the weather and geographical conditions which affect the operation of a flue pipe (rain, fog, snow, altitude a.s.l., exposure to sunlight, direction of facing), the wind is unquestionably the most decisive.
PELLET STOVES red Chapter 3 INSTALLATION AND USE MANUAL page 3. INSTALLATION AND ASSEMBLY 3.1. DRAWINGS AND TECHNICAL CHARACTERISTICS 491 Ø80 Ø48 213 130 187 193 530 61 10 391,5 1043 3.1.1. GARDENIA/MARGHERITA Air 512 Ø80 Ø48 213 156 187 219 515 60 10 391,5 1092 3.1.2.
red PELLET STOVES Chapter 3 INSTALLATION AND USE MANUAL page 3.1.3. PRIMULA/ORCHIDEA Multiair 3.1.4.
red PELLET STOVES Chapter 3 INSTALLATION AND USE MANUAL page 3.1.5. Technical characteristics Technical characteristics Overall thermal power Max. Overall thermal power Min.
red PELLET STOVES Chapter 3 INSTALLATION AND USE MANUAL Technical characteristics Overall thermal power Max. Overall thermal power Min.
PELLET STOVES red 3.2. Chapter 3 INSTALLATION AND USE MANUAL page 21 PREPARATION AND UNPACK ING GARDENIA/PRIMULA and ORCHIDEA/MARGHERITA stoves are delivered with two different types of packing: GARDENIA and PRIMULA stoves have one package o The DALIA stove has one packaging o It contains the stove and the steel sides with the profiles (Fig.1) It contains the stove as well as the steel sides and top (Fig.
red PELLET STOVES Chapter 3 INSTALLATION AND USE MANUAL page 22 Position the stove without its cladding and connect it to the flue pipe. Use the four adjustable feet (J) to get the stove correctly levelled so that the smoke outlet (S) is lined up with the connecting pipe (H) . Once the operations for connection are complete, assemble the cladding (ceramics or steel sides).
red 3.3. PELLET STOVES Chapter 3 INSTALLATION AND USE MANUAL page 23 LATERAL CLADDING ASSEMBLY Assembly of profiles to insert steel sides (GARDENIA) Remove, on the upper part, the cast iron top (A). A Take the two profiles (B) to be assembled on the front part of the stove (one to the right and one to the left).
PELLET STOVES red Chapter 3 INSTALLATION AND USE MANUAL page Assembly of profiles to insert steel sides (PRIMULA) Remove, on the upper part, the cast iron top (A). Take the side (B) (pay attention that it enters in the part under the plugs (F) and secure it to the upper sheet metal of the stove with the bracket (C) and the four screws (D). Two screws secure the bracket (C) on the stove and two secure the bracket (C) to the side (B). Repeat the same operation for both sides.
PELLET STOVES red Chapter 3 INSTALLATION AND USE MANUAL page Installation of steel sides (DALIA) Take the side “C” (make sure the underside slots into pin “D”) and secure it to the top sheet of the stove using the two screws “E and F” provided. At the rear, the side should be secured to the structure using the screw “G”. Repeat the same operation for both sides. Now raise the cover “A” and position the steel top “B”.
red PELLET STOVES Chapter 3 INSTALLATION AND USE MANUAL page Inserting the ceramic sides (ORCHIDEA/MARGHERITA) Remove, on the upper part, the cast iron top (A). Take the six ceramics (B) from the box (see page 20 section 3.2) and insert them into the profile (C) where the guide is, from the top downwards Repeat the same operation for both sides. Reposition the cast iron top. (fig.
PELLET STOVES red Chapter 3 INSTALLATION AND USE MANUAL 3.4. HOT AIR DUCT CONNECTIONS PRIMULA/ORCHIDEA MULTIAIR model page 27 FOR B min Once the stove is in position, you can begin installation of the hot air ducts. First of all, select the amount of hot air that you want to come out of the front and the back of the stove. This simple operation is performed using the mechanical lever located under the hopper cover (Figure 9).
red PELLET STOVES Chapter 4 INSTALLATION AND USE MANUAL page 4. OPERATION 4.1. PRE-LIGHTING WARNINGS Do not touch the stove during the first lighting, as it is during this phase that the paint sets. If you touch the paint, you may expose the steel surface. If necessary, touch up the paint with the aerosol spray in the original colour (see the section "Accessories for pellet stoves").
red 4.2. PELLET STOVES Chapter 4 INSTALLATION AND USE MANUAL page DISPLAY PANEL AND COMMANDS 4.2.1. Control panel logic Shown below is some useful information for understanding the logic and use of the control panel: Knob A has 5 ventilation levels. The knob rotates uniformly from min to max. Knob B allows the room temperature to be regulated. The temperature ranges from a minimum of 15°C to a maximum of 30°C, also in this case the knob turns uniformly.
red PELLET STOVES Chapter 4 INSTALLATION AND USE MANUAL page 30 KEY A. Ventilation regulation knob E. Pellet load key B. Temperature regulation knob Led 1. Multi-colour on/off led C. Flame regulation knob Led -2/-1/0/+1/+2 Pellet load level or alarm signal. D.
red 4.3. PELLET STOVES Chapter 4 INSTALLATION AND USE MANUAL page MAKING THE ELECTRICAL CONNECTIONS Connect the supply cable first at the rear of the stove and then to an electrical outlet on the wall. The main switch located on the rear of the stove should be switched on only when you want to light the stove. If you do not intend to use the stove, it is advisable to keep it switched off. Electrical connection of the stove 4.4.
red 4.7. PELLET STOVES Chapter 4 INSTALLATION AND USE MANUAL page OPERATING MODE The GARDENIA-PRIMULA-ORCHIDEA-MARGHERITA stoves have the following operating mode: 4.7.1. Setting room temperature (Knob B) By using command B it is possible to set the desired temperature for the room in which the stove is installed from a minimum of 15°C to a maximum of 30°C.
red PELLET STOVES Chapter 4 INSTALLATION AND USE MANUAL page abnormalities are found, it means that there may be a problem with the stove components or that installation may not have been carried out correctly. REMOVE THE PELLETS FROM THE BURNER AND CONTACT AN AUTHORISED TECHNICIAN. 4.8. SHUTDOWN MODE (Key D) The stove is shutdown by pressing key D.
PELLET STOVES red Chapter 4 INSTALLATION AND USE MANUAL page 34 THE CHOICE OF LOAD TYPE (0 factory default, -1/-2/+1/+2) CAN BE MADE ON FIRST INSTALLATION OR EVERY TIME IT IS NECESSARY. (E.g. when you change supplier or when you notice differences in colour or size of the pellets) 4.11. VIEWING THE FLAME In order to obtain good operation from the stove, you need to know how to "read" the flame.
PELLET STOVES red Chapter 4 INSTALLATION AND USE MANUAL page 35 4.12. Connection to a room thermostat The room thermostat is not included with the stove and it must be installed by a specialised technician. WARNING! The electrical wires must not be in contact with the hot parts of the stove. The stove can also be connected to a room thermostat.
red PELLET STOVES Chapter 4 INSTALLATION AND USE MANUAL page 4.13. Connection to the time programmer RED (optional-accessory RED) The time programmer is not included with the stove and its installation is to be handled by the user. The stove does not work with other brands of time programmer. Contact the authorised retailer. To install the optional timer, refer to the instructions inside it.
red PELLET STOVES Chapter 4 INSTALLATION AND USE MANUAL page 4.14. SAFETY DEVICES The stove is fitted with the following safety devices: MAIN STOVE POWER SUPPLY SAFETY The stove is protected by a fuse which is near to the switch (I). SMOKE TEMPERATURE SENSOR. Monitors the temperature of the smoke, and gives permission for start-up or shuts the stove down when the smoke temperature falls below the preset value. PELLET HOPPER TEMPERATURE SENSOR.
PELLET STOVES red Chapter 4 INSTALLATION AND USE MANUAL page 38 4.15. LED 1 SIGNALS DURING OPERATION LED 1 Off: stove awaiting ignition LED 1 Flashing green: ignition LED 1 Fixed green: stove fully ignited LED 1 Flashing orange: switching off LED 1 Flashing red: alarm in progress LED 1 Fixed red: stove switched off after alarm In the event of shutdown following a mains cut-off led 1 keeps flashing orange even after cooling. 4.16.
red PELLET STOVES Chapter 4 INSTALLATION AND USE MANUAL page 4.17. Shutdown mode due to alarm When an alarm intervenes the stove will go into the automatic cooling phase very similar to the "shutdown mode" to ensure the correct cooling and automatic cleaning of the system. If you wish to stop the warning tone while continuing the cooling phase, simply press key (D): the red led will become orange, still flashing, and will go out once the factory default shutdown temperature has been reached.
red PELLET STOVES Chapter 5 INSTALLATION AND USE MANUAL page 5. MAINTENANCE AND CLEANING ATTENTION! All cleaning of all parts must be carried out with the stove completely cold and unplugged. The stove does not need much maintenance if used with certified quality pellets. 5.1. DAILY AND WEEKLY CLEANING BY THE USER Example of clean grate 5.1.1. Before each lighting Using a suitable tool clean the grate “A” of ash and any incrustation which could obstruct the passage of air.
red 5.2. PERIODIC CLEANING TECHNICIAN PELLET STOVES Chapter 5 INSTALLATION AND USE MANUAL BY A 41 page SPECIALISED 5.2.1. Cleaning of the heat exchanger F Halfway through the winter, but especially in the spring, you will need to clean the compartment where discharge smoke passes. F This cleaning must be done in order to remove all combustion residues before time and humidity let them harden and make them difficult to remove.
red PELLET STOVES Chapter 5 INSTALLATION AND USE MANUAL page CLEANING THE UPPER COMPARTMENT - DALIA STOVE When the stove is cold, raise the cover “A” and remove the steel top D “B” which is merely resting on top of some rubbers. Next, remove the sides “C” as shown in Section 3.3.
PELLET STOVES red Chapter 5 INSTALLATION AND USE MANUAL page 43 5.2.2. Shutting the stove down (end of season) At the end of season, before shutting down the stove, we recommend completely removing pellets from the hopper with the use of a vacuum cleaner with an extension. During periods of disuse, the stove must be unplugged and placed in a dry place protected from the elements.
PELLET STOVES red Chapter 6 INSTALLATION AND USE MANUAL page 44 6. PROBLEMS / CAUSES / SOLUTIONS WARNING: GUIDE FOR THE EXCLUSIVE USE OF THE SPECIALISED TECHNICIAN. WARNING: All repairs must be carried out exclusively by a specialised technician, with the stove completely cold and the electric plug pulled out. The operations marked in bold type must be carried out by specialised personnel. The manufacturer will not be liable and the guarantee lapses if this condition is not respected.
PELLET STOVES red PROBLEM The stove is signalling pellet hopper temperature over the safety limit Chapter 6 INSTALLATION AND USE MANUAL LED page POSSIBLE CAUSES Solutions: Pellet load too high Room fan power too low Structure has overheated reduced heat dissipation. Led 0.
PELLET STOVES red PROBLEM The flame is weak and goes out The room fan does not stop The room fan is not working INSTALLATION AND USE MANUAL LED The pellet hopper is emptying Low pellet load Unsuitable pellet The stove is cooling down Temperature probe faulty The temperature has not reached the minimum ignition limit The thermal protection has triggered due to fan overheating Fan faulty The stove has reached the room temperature set by knob B and automatically
red PELLET STOVES Chapter 7 INSTALLATION AND USE MANUAL page 47 7. ELECTRICAL DIAGRAMS MOTHERBOARD WIRING KEY 1. Control panel 8. Gear motor 2. Room probe 9. Contact thermostat 3. Smoke probe red + blue - 10. Air fan 4. Fuse 11. Smoke ejector fan white/red/black or blue 5. Switch 6. Ignition plug 7. Smoke ejector fan revolution control 12. Timer-thermostat 13. Room thermostat N.B. The electrical wiring of the single components includes pre-wired connectors which are of different sizes.
Via La Croce n°8 33074 Vigonovo di Fontanafredda (PN) – ITALY Telephone: 0434/599599 r.a. Fax: 0434/599598 e-mail: info.red@mcz.