Installation guide
169
S
scheduling, job (LVS), 89
SCSI bus length, 144
SCSI bus termination, 144
SCSI configuration requirements, 143
SCSI identification numbers, 145
SCSI storage
requirements, 141
security
Piranha Configuration Tool, 100
send_arp program, 96
service status table, 70
shared disk storage hardware table, 16
shared storage, 21
considerations, 20
setting up, 20
single-initiator fibre channel interconnect
setting up, 139
sshd service, 97
starting the cluster software, 64
subscription registration, vi
synchronizing configuration files, 133
System V init, 71
T
tables
availability and data integrity, 11
cluster hardware, 14
cluster node hardware, 14
console switch hardware, 18
GFS software subsystem components, 5
installing the basic cluster hardware, 19
member status for Cluster Status Tool, 69
member status forclustat, 69
minimum cluster configuration components,
11
network hardware, 16
no single point of failure configuration, 13
power controller connection, configuring, 44
Red Hat Cluster Suite DLM RPM selection
criteria, 150
Red Hat Cluster Suite GULM RPM selection
criteria, 152
Red Hat GFS RPM selection criteria, 154
service status, 70
shared disk storage hardware, 16
UPS system hardware, 18
terminal server, 14
troubleshooting
diagnosing and correcting problems in a
cluster, 75
U
UPS system hardware table, 18
UPS systems
configuring, 31
W
watchdog timers
hardware-based, 14
software-based, 14
weighted least connections
(see job scheduling, LVS)
weighted round robin
(see job scheduling, LVS)