Owner Manual
4
Insert the end of 1 Copper Rail Segment
D
into the
ring at
the top of 1 Leg
F
. Insert the opposite end of the Copper Rail
5
Place
the Fire Screen
B
on top of the fire pit. Make sure to
use the Fire Tool
G
to add or move logs or for removing/
replacing the Fire Screen
B
.
Your Fire Pit is ready to enjoy!
4
5
ASSEMASSEMBLbl YY
Segment into the ring of the adjacent Leg. Secure by inserting a
Bolt
J into each ring's eyelets (closest to the segment you are
installing), and through the Copper Rail Segment.
Gently tighten
but do not fully tighten, leaving room for adjustment. Repeat to
install remaining 3 Copper Rail Segments. When all 4 Copper Rail
Segments are installed, check for alignment, then fully tighten all
hardware.
Hardware Used: J Bolt
(M6x40) x 8
6








