Quality Beyond Expectations
Table Of Contents
- Slide Number 1
- Contents
- Introduction
- REC Group – A leading, global solar company
- Vertically integrated manufacturing
- REC’s competitive advantage – minimum transport
- Slide Number 7
- Product Qualification and Testing
- International standards
- Certification results above industry standards
- Pushing the standards
- What is REC’s Combined Cycle Test?
- Internal qualification results above IEC standards
- REC goes further - Extended Qualification
- Extended qualification results double IEC Standards
- How does REC carry out its qualification?
- REC’s internal laboratory
- Other signs of quality
- Environmental and Quality Standards
- Slide Number 20
- Ensuring quality in the field
- REC’s test systems
- Proven performance in India
- Proven performance in Singapore
- Proven performance in Europe
- Reliability and Durability Model (RAD)
- Predicting and analysing degradation using models
- Slide Number 28
- Foundations for quality
- RBS and RPDM supporting quality and predictability
- RBS controls quality through all key inputs
- A highly automated manufacturing process
- In-process automated checks
- Slide Number 34
- Third party bankability audits
- Black & Veatch conclusions
- Mott MacDonald conclusions
- Summary of report findings*
- Slide Number 39
- The REC warranty
- REC’s low customer claims level is evidence of quality
- REC takes warranty claims seriously
- Summary
- Slide Number 44
16
© 2012 REC All rights reserved. Confidential © 2012 REC All rights reserved. Confidential
How does REC carry out its qualification?
Climate
chambers
REC test laboratory facilities
REC has its own laboratory equipped with state of the art equipment to test panels
and new technologies. The qualification regime is implemented whenever a
production or design change is proposed on the wafer, cell or module process to
ensure it can withstand the world’s most unforgiving environmental conditions.
Hail impact test
Tilt tables
Mechanical
Load Tester