MOUNTING REC NPEAK PANELS WITH CONTINUOUS RAILS PARALLEL TO LONG SIDE OF THE PANEL
A continuous rail (or other support structure) spans the complete underside of the panel.
9.8 in [250 mm]
9.8 in [250 mm]
4 in [100 mm]
4 in [100 mm]
9.8 in [250 mm]9.8 in [250 mm]
4 in [100 mm]4 in [100 mm]
25.6 in [650 mm]
0
00
0
0
0
25.6 in [650 mm]
CAUTION
The center point of each clamp and the minimum grip length must be fully located in the same clamping zones to be rated to that load (fig. ).
If the panel is secured in zones with different load values, it is rated to the lowest load value only.
Rail positioning
Rail position
Rail position
Legend
Clearance Gap
Clamping zone
.  .in mm) .  . in mm) >. in (>mm) <. in (<mm)
Test Load
(Design Load)
Test Load
(Design Load)
Test Load
(Design Load)
Test Load
(Design Load)
  . in
   mm)
+Pa /  Pa *
(+Pa / Pa)
+ Pa / Pa
(+Pa /  Pa)
+ Pa / Pa
(+ Pa / Pa)
X
   in
   mm)
X
+Pa /  Pa *
(+Pa / Pa)
+ Pa /  Pa *
(+ Pa / Pa)
X
 - . in
   mm)
X
+ Pa /  Pa *
(+ Pa / Pa)
+ Pa /  Pa
(+ Pa / Pa)
X
Once a module is secured in each of the  zones (fig. ), additional clamps, i.e., ≥ may be freely located on panel frame without affecting
the warranty. Loads marked with a
* were not certified as part of IEC / UL  testing; these have been evaluated by REC’s
internal testing process.
Short Side
Mounting
Long Side
Mounting
Legend
Clearance Gap
Clamping zone
.  .in mm) .  .in mm) >. in (>mm) <. in (<mm)
Test Load
(Design Load)
Test Load
(Design Load)
Test Load
(Design Load)
Test Load
(Design Load)
Rail length under
module
 -  mm
Min.
2
5 m
m
Max
.
100 mm
  . in
  mm)
X
+Pa /  Pa *
(+Pa / Pa)
+Pa /  Pa *
(+Pa / Pa)
X
.  . in
  mm)
+Pa /  Pa *
(+Pa / Pa)
+ Pa / Pa
(+ Pa / Pa)
+ Pa / Pa
(+ Pa / Pa)
X
.  . in
  mm)
+Pa /  Pa *
(+Pa / Pa)
+ Pa / Pa
(+ Pa / Pa)
+ Pa / Pa
(+Pa / Pa)
X
. - . in
  mm)
+Pa /  Pa *
(+Pa / Pa)
+ Pa / Pa
(+Pa / Pa)
+Pa / Pa
(+ Pa / Pa)
X
. - . in
  mm)
+Pa /  Pa *
(+Pa / Pa)
+ Pa / Pa
(+Pa / Pa)
+ Pa / Pa
(+Pa / Pa)
X
   in
  mm)
X
+Pa /  Pa *
(+Pa / Pa)
+Pa /  Pa *
(+Pa / Pa)
X
 - . in
  mm)
X
+Pa /  Pa *
(+Pa / Pa)
+ Pa / Pa
(+Pa / Pa)
X
Rail length under
module
 -  mm
Min.
1
00
mm
Max
.
200 mm
  . in
  mm)
X
+Pa /  Pa *
(+Pa / Pa)
+Pa /  Pa *
(+Pa / Pa)
X
.  . in
  mm)
+Pa /  Pa *
(+Pa / Pa)
+Pa / Pa
(+ Pa / Pa)
+Pa / Pa
(+ Pa / Pa)
X
.  . in
  mm)
+Pa /  Pa *
(+Pa / Pa)
+ Pa / Pa
(+ Pa / Pa)
+ Pa / Pa
(+ Pa / Pa)
X
. - . in
  mm)
+Pa /  Pa *
(+Pa / Pa)
+ Pa / Pa
(+Pa / Pa)
+Pa / Pa
(+ Pa / Pa)
X
. - . in
  mm)
+Pa /  Pa *
(+Pa / Pa)
+ Pa / Pa
(+Pa / Pa)
+ Pa / Pa
(+Pa / Pa)
X
   in
  mm)
X
+Pa /  Pa *
(+Pa / Pa)
+Pa /  Pa *
(+Pa / Pa)
X
 - . in
  mm)
X
+Pa /  Pa *
(+Pa / Pa)
+ Pa / Pa
(+Pa / Pa)
X
Once a module is secured in each of the  zones (fig. ), additional clamps, i.e., ≥ may be freely located on panel frame without affecting
the warranty. Loads marked with a * were not certified as part of IEC  / UL testing; these have been evaluated by REC’s
internal testing process.