Installation & Assembly
A 8 ea
End connector
C 12 ea
Vertical Pole
B 4 ea
Long Shelf
Assembly
Time:
Less than
15 minutes.
This product's intended use is for
garment storage.
Tools Needed: No tools required.
MADE IN CHINA
Part
A
B
C
Printed in China
STEP 1. Insert long shelf (B)
into two end connectors (A).
STEP 4. Assembly is now
complete.
STEP 2. Working from the
bottom up, insert 4 vertical poles
(C) into top of end connectors
(A). Repeat step 1 for second
shelf.
STEP 3. Insert bottom of end
connectors (A) of assembled
shelf onto end of vertical poles
(C). Repeat these steps for each
additional shelf.
Note: All metal parts
must be inserted firmly and
completely into the plastic parts.
B
B
B
B
A
A
C
C
C
C
C
C
C
C
C
C
C
C
A
A
A
A
A
A
4-Tier Closet Shelves
NEED HELP? For help with assembly, or if you are missing a part,
please call or email us.