User guide

Rack information C–27
Hitachi Unified Storage VM Block Module Hardware User Guide
To reduce the risk of injury to persons or damage to equipment, it is
recommended that all equipment be removed from the rack, in order from
top to bottom. Transport the rack and the components individually to the
desired location.
If you need to move the rack with the mounted components in it, use the
pallet on which the rack was shipped to you. Be careful when loading the
rack onto the pallet. Secure the rack on the pallet as it was shipped and
received.
Securing multiple racks together with a baying kit
Baying kits are used to secure multiple racks together. To secure multiple
racks, use the following procedure.
1. Remove side panels from the cabinets that are to be bayed together.
2. Open the contents of the baying kit.
3. Place the cabinets side by side until they touch.
4. After the cabinets are leveled, remove the two front-center roof
installation screws using the TORX® tip tool supplied.
5. Place the baying plate on top (aligning the holes), and then reinstall
the roof installation screws into both holes to connect the cabinets (see
Detail A).
6. For the baying connection at the front bottom, the M12 bolts must be
started by hand into the holes at the bottom of the frame until they are
high enough to clear the TORX tool for final tightening ).
Figure C-13: Maximum Incline for moving a fully loaded rack