Specifications

6
Installation Procedures
PHYSICAL INSTALLATION
Before you begin installing your Ready Access Air Curtain, you must determine what type of
installation will be required. Wood Frame, Masonry Framing, etc. See the illustration below to
determine your rough opening size and mounting.
Warning: Two people are required for the lifting and installation of the air curtain.
Figure 2
CONFIRM THAT THE CUSTOMER-SUPPLIED FRAME IS MADE TO ACCOMMODATE THE
DIMENSIONS AS ILLUSTRATED ABOVE.
Confirm that AC power has been run and is ready for connection to the Air Curtain.
Check shipping carton for any shipping damage and remove Air Curtain from the carton.
Check Air Curtain for any shipping damage.
Once the application has been determined, check the daylight opening of the frame being used.
The opening dimensions should be 47 ¾” wide x 16 ¼” high.
The electric should be installed from the breaker box (Load Center) to the Air Curtain opening
before the installation.
Window Air Unit
1. Remove the Outside cover from the unit.
2. Position the unit as shown in Figure #2. Note the position of the unit. The inside surface
should be flush with the window
From the Outside
3. Secure the unit to the window with the 6 – self-tapping screws. (Provided)
4. Secure the unit to the building with the 4 - #12 x 3” long screws. (Provided)
5. Run a bead of caulk around air curtain to seal all gaps to prevent water penetration.
6. Caulk heads of screws to prevent water penetration.
NOTE: Clearance holes are not provided due to different building constructions.