Specifications
7
Electrical Installation
All power must be connected and wired by a qualified electrician and be in compliance with all state and local building
codes.
1. Remove the (4) #2 phillips drive screws from the inside cover.
2. Located in the upper right hand of AA100 unit, will be an electrical entry junction box.
Remove cover and expose (1) black wire (HOT), (1) white wire (COMMON) and (1) green wire (GRD).
WARNING - Disconnect power at service panel / circuit breaker before installation to AA100 unit.
OSHA Lock Out-Tag Out procedures are to be observed to prevent power from being switched accidentally.
3. Route incoming 115VAC from ceiling (or where dictated from customer) in Solid, Flexible conduit or Commercial
Power Track for Cosmetics (MUST MEET STATE AND LOCAL CODES) into knockout provided on the face
panel of AA100 unit that leads into Electrical entry junction box.
4. Connect wires together and insulate ends with wire nuts or crimp caps inside junction box.
Reinstall Electrical entry junction box cover.
5. Press Push Button switch to test unit for operation.
6. Close inside cover and install the (4) screws.
Electrical Entry
to Junction Box










