Specifications
17 
WARNING: 
TWO PEOPLE ARE REQUIRED FOR THE LIFTING AND 
INSTALLATION OF THE WINDOW. 
1.  Confirm that the customer-supplied frame is made to accommodate the dimensions. 
2.  Confirm that AC power has been run and is ready for connection to the window. 
3.  Check shipping carton for any shipping damage and remove window from the carton. 
4.  Check window for any shipping damage. 
NOTE: There are two wall-mounting applications. The mounting space can be 
surrounded either by sidelights (windows) or masonry. In both cases the upper 
part of the window above the counter top (window sill) fits flush with the outside 
of the wall. The illustrations will show the walls with the sidelights, as this is the 
most common application. (Figure 3 and 4) 
Figure 3             Figure 4 
NOTE: If mounting the window in a masonry wall the window mounts flush with the 
outside finishing of the building. Drill points are scribed directly into the masonry. 
The outside edge of the mullion should be flush with the outside finishing of the 
building. (See Figure 3 and 4) 
5.  Position the window and place it into the customer-supplied frame. As shown in Figure 3 and 4 
6.  With one person holding the window in place, level the window using the shim shingles as 
needed. 