Specifications
NDA-24213 CHAPTER 9
Page 193
Issue 3.0
ACD Procedures
Week Schedules
(b)
Time
Select a Start Time for the day selected in Step 4a. Click in the field to generate up and down
arrows. The first entry is preset at “00:01.”
(c)
CCV Index
Select a CCV Index (reference number) for a Call Control Vector (see Heading 7, “Call Control
Vectors,” Step 4) assigned to this Week Schedule. Click in the field to generate up and down
arrows.
(d)
CCV Step
Select the Call Control Step number (between 1 and 20) in this CCV which begins the sequence
of call routing for the day and time programmed above. Click in the field to generate up and
down arrows.
Since Monday at one minute past midnight is the beginning of the week to the ACD, the
Index
and
Step
values for the first (Monday) entry will be automatically programmed with the values
of the last entry made if no other entries have been made in the Monday fields. Under ordinary
circumstances the user will not need to program the Monday entry.
STEP 4: Repeat Steps 4a, 4b, 4c, and 4d for each entry you want to include in the Week Schedule.
STEP 5: Press
Update
to save the new information.
STEP 6: Press
Close
to exit the data screen.