Installation Guide

11
9.
To allow for baluster expansion, raise the
top rail approximately 1/8". Pre-drill the
holes for the mounting brackets to avoid
stripping the stainless steel screws, and
secure in place (Fig. 17, 18).
(Fig. 18)
(Fig. 19)
(Fig. 17)
10.
Check entire installation for accuracy
before snapping Screw Head Covers
(Fig. 19) into place.