Installation Guide

7
ENGLISH
Endurance Original Rail stair brackets do not
need to be cut, and work at angles between
32° and 38°.
A) Aluminum Bottom Rail Stiffener – 1
B) Vinyl Bottom Rail – 1
C) Aluminum Top Rail Stiffener – 1
D) Vinyl Top Rail – 1
E) Balusters – (See chart below)
F) Bottom Rail Mounting Bracket – 2
F.A) Low Angle Bracket Insert – 2
F.B) High Angle Bracket Insert – 2
G) Top Rail Bottom Mounting Bracket – 1
H) Top Rail Top Mounting Bracket – 1
I) Snap on Bracket Covers – 2
J) Top Rail Mounting Screws,
3" length – 4
K) Bottom Rail Mounting Screws,
2" length – 8
L) Top Rail Set Screws, 1" length – 4
M) Press-in Plugs – 8
A
B
C
D
E
F
G
H
KIT LENGTH SQUARE BALUSTERS
PER KIT
TURNED BALUSTERS
PER KIT
ROUND BALUSTERS
PER KIT
GLASS
BALUSTERS
PER KIT
6' 12 12 14 7
8' 16 16 19 N/A
F. A
F. B
9.0 9.5 10.0 10.5 11.0 11.5 12.0 12.5 13.0
6.0
32 32 31 30 29 28 27 26 25
6.5
36 34 33 32 31 29 28 27 27
7.0
38 36 35 34 32 31 30 29 28
7.5
40 38 37 36 34 33 32 31 30
8.0 42 40 39 37 36 35 34 33 32
8.5 43 42 40 39 38 36 35 34 33
RUN (INCHES)
– Safety goggles
– Tape measure
– Pencil
– Level
– Power screwdriver/drill
– Power saw
TOOLS NEEDED:
STAIR RAIL
Warning: Always wear safety goggles.
COMPONENT LIST:
Check the kit to ensure all components are included.
NOTE: Check with your local building code ofce for design load requirements for guard rails and bottom space requirements. All supporting
structures should be built in accordance with applicable building codes.
LIMITED WARRANTY
To obtain and review a copy of the warranty please go to: rdirail.com/warranty. You can also contact (877) 420-7245 or write to:
RDI Warranty, 545 Tilton Road, Egg Harbor City, NJ 08215 to obtain a copy of the warranty.
K
L
M
J
I