Installation Guide

10
ENGLISH
7.
Slide a top rail mounting bracket in place
with at side facing the mounting post. Top
stair mounting bracket (H) should be at top of
the stair and bottom stair mounting bracket
(G) should be at the bottom (Fig. 14).
8.
Insert a baluster into each rout of the
bottom rail.
NOTE: Each kit with vinyl balusters contains
2 tabbed balusters; space them evenly into
each section.
Set the top rail in place by inserting the
rst baluster (at the upper post) in the
corresponding rout of the top rail, and work
toward the bottom (Fig. 15).
6.
Cut the top rail to t (Fig. 13).
(Fig. 13) (Fig. 14) (Fig. 15)
STAIR RAIL CONTINUED