Installation Guide
7
ENGLISH
Endurance Original Rail stair brackets do not
need to be cut, and work at angles between
32° and 38°.
A) Aluminum Bottom Rail Stiffener – 1
B) Vinyl Bottom Rail – 1
C) Aluminum Top Rail Stiffener – 1
D) Vinyl Top Rail – 1
E) Balusters – (See chart below)
F) Bottom Rail Mounting Bracket – 2
F.A) Low Angle Bracket Insert – 2
F.B) High Angle Bracket Insert – 2
G) Top Rail Bottom Mounting Bracket – 1
H) Top Rail Top Mounting Bracket – 1
I) Snap on Bracket Covers – 2
J) Top Rail Mounting Screws,
3" length – 4
K) Bottom Rail Mounting Screws,
2" length – 8
L) Top Rail Set Screws, 1" length – 4
M) Press-in Plugs – 8
A
B
C
D
E
F
G
H
KIT LENGTH SQUARE BALUSTERS
PER KIT
TURNED BALUSTERS
PER KIT
ROUND BALUSTERS
PER KIT
GLASS
BALUSTERS
PER KIT
6' 12 12 14 7
8' 16 16 19 N/A
F. A
F. B
9.0 9.5 10.0 10.5 11.0 11.5 12.0 12.5 13.0
6.0
32 32 31 30 29 28 27 26 25
6.5
36 34 33 32 31 29 28 27 27
7.0
38 36 35 34 32 31 30 29 28
7.5
40 38 37 36 34 33 32 31 30
8.0 42 40 39 37 36 35 34 33 32
8.5 43 42 40 39 38 36 35 34 33
RUN (INCHES)
– Safety goggles
– Tape measure
– Pencil
– Level
– Power screwdriver/drill
– Power saw
TOOLS NEEDED:
STAIR RAIL
Warning: Always wear safety goggles.
COMPONENT LIST:
Check the kit to ensure all components are included.
NOTE: Check with your local building code ofce for design load requirements for guard rails and bottom space requirements. All supporting
structures should be built in accordance with applicable building codes.
LIMITED WARRANTY
To obtain and review a copy of the warranty please go to: rdirail.com/warranty. You can also contact (877) 420-7245 or write to:
RDI Warranty, 545 Tilton Road, Egg Harbor City, NJ 08215 to obtain a copy of the warranty.
K
L
M
J
I










