Excalibur ® INSTALLATION INSTRUCTIONS
Need a little help installing your railing? www.rdirail.com/support/installation-videos.html LEVEL RAIL INSTRUCTIONS Warning: Always wear safety goggles. 1. 2. Determine the desired rail placement and snap a line on the deck to ensure all posts are aligned properly (Fig. 1). Ensure sufficient mounting structure exists in areas to receive posts. Install blocking where necessary. Plumb the posts, using the shims provided, and secure all posts in place (Fig. 2).
. 4. 5. Test fit the rail panel. Once a proper fit is ensured all cuts must be painted prior to final installation (Fig. 8). Place a bracket cover over the rail next to the bracket and slide the bracket cover toward the post until it snaps into place (Fig. 10). Assemble the 2 piece post trim cover by inserting one fastener in each trim half (Fig. 11). Snap these in place (Fig. 12) concealing the post flange. Set the panel in place. Pre-drill the screw holes using a 5/32" metal drill bit.
STAIR RAIL INSTRUCTIONS Warning: Always wear safety goggles. 1. 3. Place a plank on the stair noses spanning from post to post. Place the stair panel on the plank across the opening and adjust for plumb ensuring equal baluster spacing at each end. Clamp the panel in place at this location (Fig. 13). Add 7/8" (toward rail end or post) to the marks made on the rail panel in step 2 (Fig. 15) and cut panel at these marks (Fig. 16).
4. 5. 6. Reinsert the painted panel ends into the brackets and secure in place (Fig. 19) using the supplied self-tapping panel attachment screws through the pre-drilled bracket holes. Separate the two bracket halves at all rail ends. Install the post half of each mounting bracket at the marks made in step 3 (Fig. 20) ensuring all brackets are properly oriented. Now set the panel back into place and re-attach the bracket halves (Fig. 21).
LEVEL BRACKET & ANGLES INSTRUCTIONS Warning: Always wear safety goggles. LEVEL BRACKET LEVEL ANGLES 1. 2. Establish the placement of the bottom of the level panel based on your desired rail height. Mark a line on your mounting surface at this height plus 1 1/8" to represent the top of the mounting bracket (Fig. 24). Mark the post 34 1/8" (34 1/8" for 34" high panels or 40 1/8" for 40" high panels) from the bottom bracket attached in Step 1 (Figs. 26 & 27).
CARE & MAINTENANCE While Metal Works products are low maintenance, like any outdoor product, care must be taken to ensure the railing’s longevity. It is essential that the following instructions be followed to prevent damage to the product or personal injury: 1. Regularly, at LEAST once a year, inspect and tighten all fasteners, as fasteners may loosen over time. Note that some surface rust may occur on fasteners. This is normal and not subject to a warranty claim. 2.
WARRANTY Railing Dynamics, Inc. (“RDI”) warrants to the original consumer/purchaser (the “Purchaser”) of RDI’s Metal Works™ products (the “Product”) that the Products will remain free from material defects in workmanship and materials. In addition, this Warranty also will cover cracking, peeling and blistering of the finish and extensive corrosions of the Product. Corrosion will not be considered extensive except where there are multiple rust-through perforation instances on the same piece of the Product.
HOMEOWNER’S REGISTRATION REGISTER ONLINE AT: WWW.RDIRAIL.COM/WARRANTY OR FILL OUT & MAIL THIS FORM TO REGISTER PRODUCT WARRANTY Complete only one registration per installation or product. For multiple product purchases, complete one warranty card and list the serial numbers for remaining products. PLEASE COMPLETE YOUR REGISTRATION WITHIN THIRTY (30) DAYS OF PURCHASE.
Need a little help installing your railing? www.rdirail.com/support/installation-videos.html RAILING DYNAMICS, INC. FOR HOME, FOR LIFE® 135 STEELMANVILLE ROAD EGG HARBOR TOWNSHIP, NJ 08234 TEL: (877) 420-7245 FAX: (866) 277-5160 E-MAIL: CS@RDIRAIL.COM URL: WWW.RDIRAIL.COM Excalibur ® REV.