Installation guide
68 Installation/Mounting the Dish
POLE MOUNT
Material List:
• 1 EA. 1 1/4"ID
Schedule 40 galva-
nized steel pipe (1-
1/20D).
• 3 Bags quick
setting concrete.
• 1 EA. 1 l/2" Ground
clamp.
• 1 EA. Ground rod
• 1 EA. Ground rod
clamp.
• Ground Conductor
(NO. 10 copper or
NO. 8 aluminum).
• Wire ties.
Tool List:
• Hole digging tools.
• Hammer.
• Wheelbarrow.
• Bubble level or
plumb line.
• Assorted box or
open end wrenches.
• Screwdriver.
• Pencil.
]k
St
_L
1 1/4
I.D.
SCH40
CLAMP
GROUND ROD ,- ,_
lr
o
o o
p_o o_c
p o 'd I_o c
o
,,d ._° o _ I_. b.,
32"
26"
MIN
4. .11
8"
¶r
Figure 52, Pole Mounting DSS Dish