Installation guide

Installation/Mounting theDish 61
6. Horizontally level the mast with a bubble level or plumb line.
To level the mast horizontally with either a bubble or plumb line, place them on the
mast at an perpendicular angle to the wall. If you are using a bubble level, move
the bottom of the mounting foot to center the bubble in the window of the level.
If you are using a plumb line, move the bottom of the mounting foot until the line
hangs parallel with the mast. Then, with a pencil, draw line from the center line
of the lower foot onto the wall. For a detailed procedure on horizontal leveling,
see pages 35 of this manual.
7. Align the center mark of the mounting foot with the line draw n in the horizontal level
procedure, With a pencil, mark the remaining three outside holes.
8. Remove the mounting foot. Then drill three 112" holes at the locations just marked.
9. Install a wall anchor in each hole.
10. Use four 1/4" x 1-/12" machine screws and 1/4" washers to attach the mounting
foot to the wall. Tighten all four of these screws.
11. Vertically Level the dish.
First loosen the bolts on the mounting foot securing the vertical adjustment.
Place the level, or plumb line, on the mast at an parallel angle to the wall. If
you are using a bubble level, move the mast vertically to center the bubble in
the window of the level. If you are using aplumb line, move the mast vertically
until the line hangs parallel with the mast. Then, tightan the two mounting bolts
securing the mast to the mounting foot. For a detailed explanation of vertical
leveling, see page 35 of this manual.
12. Check tightness of all bolts and proceed to the Assembling the Dish Compo-
nents section.