Installation guide

Installation/Mounting the Dish 45
LOOSEN
Figure 32, Loosening Lower Nuts
required for the installation. These screws reduce the side-to-side movement
of the dish.
12. Vertically level the dish with a bubble level or plumb line.
To do this, place the level, or plumb line, on the mast at an parallel angle to
the wall. If you have not loosened the two bolts securing the azimuth
adjustment on the mounting foot, do it now. If you are using a bubble level,
move the mast vertically to center the bubble in the windov¢ of the level. If
you are using a plumb line, hold the string of the plumb line over the top of
the mast so it hangs at a perpendicular angle to the mounting surface. Move
the mast vertically until the plumb line hangs parallel to the side of the mast.
Tighten the two mounting bolts securing the mast to the mounting foot. For
a more detailed description of this procedure, see the Leveling the Dish
section of this manual.
13. Check tightness of all bolts and proceed to the Assembling the Dish section.