Instruction manual
Fi d b b il & h B il M l
Fi
nne
d
 co
pp
er tu
b
e gas 
b
o
il
ers 
&
 water 
h
eaters – 
B
o
il
er 
M
anua
l
24
F
F
Table 18  Low air condition action, L225-L2300
Stage Control Action
1 No Power to Flame Sense Module
Table 19  Low air condition action, L600-L2300
Stage Control Action
1 No Power to Flame Sense Module
2 No Power to Flame Sense Module
OPERATION SEQUENCE, ON/OFF 
L225 THROUGH L2300
  Refer to the wiring diagram included with the unit 
for further control system info.
POWER ON:
Demand for Heat: 
1.   e operator switch closes, energizing pump delay timer TD4 
and the water pump(s). 
2. Water  ow through the unit closes the water  ow switch contacts 
energizing blower delay timer TD3. 
3.   e system checks all primary limit(s) and other interlocks before 
starting pre-purge.   e unit will not start if any switch is open.
Prepurge: 
1.  Blower delay timer TD3 energizes the high speed windings of 
the blower(s). 
2.   Air pressure in the combustion chamber is sensed. If the air 
pressure is su cient, the pressure switch closes allowing the 
blower delay timer TD1 to start a 10 second pre-purge. 
Ignition Trial: 
1.   Blower delay timer TD1 times out and the  ame sense module, 
FSM, is energized. 
2.  e FSM starts the 10-second ignition trial, energizing relay 
R7, the pilot solenoid valve and the spark generator. 
3.  e pilot valve and spark generator are energized for the 
10-second ignition trial. When the pilot  ame is sensed, the 
FSM sends 24VAC to its MV terminal energizing the safety 
and main solenoid valves and relay R8, de-energizing relay R7 
and the spark generator. 
4. 
If the pilot  ame isn’t sensed, the FSM de-energizes the PV 
terminal and waits 5 minutes before initiating the second ignition 
trial.   e blower(s), pump(s) and optional power venter will 
remain on during this time. 
5. On CSD-1 equipped units the blower(s) and optional power 
venter will shut down and the boiler/water heater will lock if 
the second ignition trial fails.   e unit must then be manually 
reset by depressing the reset bu on on the le jacket panel. 
6.   On non-CSD-1 equipped units the FSM will wait 10 
minutes a er the second unsuccessful ignition a empt then 
begin the ignition process described in step 3 above.  e FSM 
will continue to cycle the unit through steps 3, 4 and 6 until 
the unit lights or the demand for heat is removed.
Main Burner 
Once the pilot is proven, the MV terminal on the FSM is energized 
sending 24VAC to the safety and main solenoid valves.
Normal Operation 
On single stage units the blowers and gas valves operate at one 
input.
Demand Satis ed: 
1.   When the demand for heat is satis ed the operator switch will 
open, de-energizing relay R8, TD1, TD3, TD4, the FSM, and 
the pilot, main and safety solenoid valves.   e pilot and main 
 ames are extinguished. 
2.  e blower delay timer TD3 starts the 80 second post-purge 
timing.  e blower(s) shut(s) o when TD3 times out. 
3.  e pump delay timer TD4 starts the post-purge timing.  e 
pump(s) remain on for 0.1 to 10 minutes then shut(s) o  when 
TD4 times out.
High Limit, Low Water Flow, Low Gas Pressure, High Gas 
Pressure, Power Venter Interlock Faults 
1.   Electrical power to the gas valves, blower(s) and optional power 
venter will be interrupted if any safety is tripped. 
2.   e manual reset high limit can be reset by depressing the reset 
bu on on the le jacket panel.
Low Air (Blocked Flue/Air Inlet) 
•   e pressure switch will monitor blower air ow. 
•  Air monitoring will begin at pre-purge. If a low air condition is 
present power will not be supplied to the FSM.  e blower(s) 
will remain on.










