Installation Manual Part 7
FCC 10: CDG-ARTU EXHIBIT C
MAGNASTAR C-2000 DIGITAL AIRBORNE TELEPHONE SYSTEM
9.1.11 RECEIVE SIGNAL STRENGTH MEASUREMENT USING GENSTAR GROUND
STATION
This test step is a verification of operational capabilities of the C-2000 if the installer is able to monitor a
GTE Airfone Ground Station from the location at which the system is being installed. If communications
with a ground station is possible, the Pilot Status screen will indicate that the ARTU is in sync with the
ground station Pilot control channel.
---V4.0A MIr1' Radio Responses-
: C-2000 reports statua update ENABLED.
I
,
PrM8 r2 to Vi- Status Display
:IHS1A115 :
I I
I ,
:~t_, ay.t- cSoea DOt appear to be monitoring a grOUDdatation. :
: .) Have you waited several minutes for the pilot scanning to complete and :
: tha 8Y8t- to lock on and monitor a groundstation. :
: b) Are you 8Ure that the location you are currently at will support :
: c.-micatioos between the AR'n1 and the groundstetion? Check to see :
: that this .line of sight. RP system is not blocked. i.e. the antenna :
: i. not blocked by carta. hanger. door. being closed or a building in :
: the way. :
(a).turn: -
Figure 9.
RSS Measurement Using GenStar Ground Station MMTI Troubleshoot Screen.
9-14
RevB