CATALOG NO.: 5000.60 B Effective: 4-09-08 Replaces: 3-15-99 T-2 Raypak B6000 Metasys™ N2 System Protocol Interface T-2 Communications Interface Raypak B6000 Boiler Controller to Johnson Controls Metasys N2 Interface Card Installation and Operating Manual P/N 240717 Rev.
TABLE OF CONTENTS 1.0 Product Specifications ......................................................................................................................... 3 2.0 Metasys Slave Port Functionality ......................................................................................................... 4 2.1 N2 Slave Communications ....................................................................................................... 4 2.1.1 Command/Replay Cycle .....................................
1. Product Specifications The Raypak Gateway card is a hardware product designed to be a communications front end for the Raypak B6000 Boiler Control and Johnson Controls N2 compatible masters.
2.0 Metasys Slave Port Functionality 2.1 N2 Slave Communications The Comminications Interface card supports the Johnson Controls Metasys™ N2 Protocol, as a slave, on port 1. This capability allows the module to communicate data from the Raypak B6000 Boiler Control to a Johnson Controls Metasys Master such as the Johnson Controls Companion™ or Metasys software. The following discusses the functional capabilities of the card. 2.1.
Writing Attributes The data object attributes can be configured by a master using the following commands: 2/1 2/2 2/3 2/4 Write Analog Input Attributes Write Binary Input Attributes Write Analog Output Attributes Write Binary Output Attributes Controlling the B6000 Controller Access to the control functions is made available through the Override commands.
Hardware Setup 3.0 3.1 1500 Interface Card Setup 3.1.1 Connecting Power to the T-2 Card The T-2 Card requires an external source of DC voltage. The DC source voltage should be between 9V and 30V. The power is connected to TB1, located near the two 9 pin serial port connections. The connection to TB1 is as follows: TB1-1 9-30 VDC (+) TB1-2 Common(-) 3.1.2 SW 1 1 2 3 4 5 6 7 8 O F F ↓ • • Dip Switch Configuration The T-2 card is configured primarily through two sets of dip switches.
The parameters are defined as follows: Baud Rate: The baud rate at which the module is to operate. The baud rate is configured as follows: Value Baud Rate 0 1 2 3 4 5 6 300 Baud 600 Baud 1200 Baud 2400 Baud 4800 Baud 9600 Baud* 19200 Baud If a value outside of this range is selected,upon firing the power up process the card’s LEDs will flash on 1/2 second intervals until a correct address is selected. Powering down is not necessary.
4.0 N2 System Protocol Support The Raypak T-2 card supports several data read and write commands for the N2 System protocol. The decision on which command to use is made depending on the type of data being addressed, and the level of protocol support in the master equipment. The following sections detail the different commands supported by the module. 4.1 Attribute Commands The T-2 Interface card supports the reading and writing to the data object attributes.
5.0 Diagnostics Several hardware diagnostics capabilities have been implemented using the LED indicator lights on the front of the 1500 card. The possible conditions as indicated by the lights are: 5.1 LED Indicators Several hardware diagnostics capabilities have been implemented using the LED indicator lights on the front of the module.
APPENDIX A Metasys Point Mapping 10
Raypak Controller N2 Registers Raypak Metasys Register Assignments Analog Output AO1 AO2 AO3 AO4 AO5 AO6 AO7 AO8 AO9 AO10 AO11 AO12 AO13 AO14 AO15 AO16 AO17 AO18 AO19 AO20 AO21 AO22 AO23 AO24 AO25 AO26 AO27 AO28 AO29 AO30 AO31 AO32 AO33 AO34 AO35 AO36 Parm Offset 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 53 54 55 57 160 161 162 163 164 165 Description Setpoint Day Setup (Desired water temp @ 70F) Nitesetpoint Night Setpoing (Desired water temp @ 70F) Ratio Out 1-200 = 0
Raypak Controller N2 Registers Raypak Metasys Register Assignments Analog Input AI 1 AI 2 AI 3 AI 4 AI 5 AI 6 AI 7 AI 8 AI 9 AI 10 AI 11 AI 12 AI 13 AI 14 AI 15 AI 16 AI 17 AI 18 AI 19 AI 20 AI 21 AI 22 AI 23 AI 24 AI 25 AI 26 AI 27 AI 28 AI 29 AI 30 AI 31 AI 32 AI 33 AI 34 AI 35 AI 36 AI 37 AI 38 AI 39 AI 40 AI 41 AI 42 AI 43 AI 44 AI 45 AI 46 AI 47 AI 48 AI 49 AI 50 Parm Offset Description 60 Outdoor Temperature + 35 61 Water Temperature + 35 62 Controller Target Temp 63 Valve Positions (0-100%) - Boiler
Raypak Controller N2 Registers AI 51 AI 52 AI 53 AI 54 AI 55 AI 56 AI 57 AI 58 AI 59 AI 60 AI 61 AI 62 AI 63 AI 64 127/128 129/130 131/132 133/134 135/136 137/138 139/140 141/142 150 151 152 152 153 154 Boiler Valve Down Times (Sec) #1 Boiler Valve Down Times (Sec) #2 Boiler Valve Down Times (Sec) #3 Boiler Valve Down Times (Sec) #4 Boiler Valve Down Times (Sec) #5 Boiler Valve Down Times (Sec) #6 Boiler Valve Down Times (Sec) #7 Boiler Valve Down Times (Sec) #8 OC Dead band: Off T>)C, ON T<=OC-OCWait 1 :
Raypak Controller N2 Registers Raypak Metasys Register Assignments Binary Output Bl 1 Bl 2 Bl 3 Bl 4 Bl 5 Bl 6 Bl 7 Bl 8 Bl 9 Bl 10 Bl 11 Bl 12 Bl 13 Bl 14 Bl 15 Bl 16 Bl 17 Bl 18 Bl 19 Bl 20 Bl 21 Bl 22 Bl 23 Bl 24 Bl 25 Bl 26 B127 Bl 28 Bl 29 Bl 30 Bl 31 Bl 32 Bl 33 Bl 34 Bl 35 Bl 36 Bl 37 Bl 38 Bl 39 Bl 40 Bl 41 Bl 42 Bl 43 Bl 44 Bl 45 Bl 46 Bl 47 Bl 48 Parm Offset 58/0 59/0 59/1 110/0 71/0 /1 /2 /3 /4 /5 /6 /7 /8 /9 /10 72/0 /1 /2 /3 /4 /5 /6 /7 /8 /9 /10 73/0 /1 /2 /3 /4 /5 /6 /7 /8 /9 /10 74/0 /1 /2
Raypak Controller N2 Registers Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl Bl 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 75/0 /1 /2 /3 /4 /5 /6 /7 /8 /9 /10 76/0 /1 /2 /3 /4 /5 /6 /7 /8 /9 /10 77/0 /1 /2 /3 /4 /5 /6 /7 /8 /9 /10 78/0 /1 /2 /3 /4 /5 /6 /7 /8 /9 /10 Boiler Not On Line OK - Boiler Operation Low Water outoff Low Pressure
T-2 (Raypak B6000 Metasys N2 System Protocol Interface) Contents Quantity T-2 EPROM (CPX.XNMn) in small black ESD box 1 1 Check packaging for damage or missing components IMPORTANT NOTICE: These instructions are intended for the use by qualified personnel only, specifically trained and experienced in the installation of this type of equipment and related system components. Installation and service personnel may be required by some states to be licensed.
T-2 INSTALLATION AND MOUNTING T-2 Module should be mounted on a permanent base not subject to vibrations, moisture or dust. It should be readily accessible, for serviceability. MECHANICAL INSTALLATION Mount the System Protocol Interface within five (5) feet of B6000 System Control Box. The Gateway Interface must be mounted vertically with conduit holes facing downward. Conduit holes are provided to accommodate standard conduit fittings.
WIRING 1500 - RPK 1. Open front door of System Protocol Interface Gateway Enclosure. 2. Remove Four Screws and the lower cover, revealing the field wiring blocks. 3. Attach wires from Johnson Controls Metasys N2 Interface Card (N2 BUSS) to the field wiring side of left terminal block (N+, GND, N=, N- GND). Refer to diagram in this user manual. 4. Turn off power to the B6000 System Control Box. 5. Open front door of the B6000 System Control Box. 6.
B6000 SYSTEM CONTROL BOARD EPPROM, U4 19
CHECK YOUR POWER SOURCE CIRCUIT BREAKER PANEL AC 108 Volts AC Minimum, 132 Volts MAX AB = 108 Volts AC Minimum, 132 Volts MAX BC = Must be less than 1.
APPENDIX B Communication Cable Connection Diagrams 21
www.raypak.com Raypak, Inc., 2151 Eastman Avenue, Oxnard, CA 93030 (805) 278-5300 FAX (805) 278-5489 Litho in U.S. A.