Product specifications

Chapter 6: Installation 95
If your Raytheon equipment is going to be connected to other equipment
using a cable not supplied by Raytheon, a suppression ferrite MUST
always be fitted to the cable close to the Raytheon unit.
Planning the Installation
Before you install your system, you should spend some time planning
the installation, giving consideration to:
Location
Siting the display unit for ease of use
Providing access for servicing the equipment
Section 6.3 provides further details regarding location of the display unit.
Integrated Systems
What other instruments need to be connected to your chartplotter
How do these instruments interface to the chartplotter (Seatalk,
NMEA and/or HSB)
Section 6.4 provides information on these interface and defines the data
that can be transferred via SeaTalk and NMEA.
Cable runs
What cables, in addition to the power cable, are required
Cables must be run to avoid physical damage, exposure to heat
and acute bends
Section 6.5 provides cable details, including recommended lengths.
The remaining sections of this chapter cover the following topics:
Unpacking and inspecting the components
Location of the Display Unit
Integrated Systems
Cable Runs
Mounting the Display Unit
HSB Series System Connections
System Check and Initial System Set Up
Planning the
Installation